My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-026
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 10:40:12 AM
Creation date
2/20/2025 10:34:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/30/2001
Control Number
2001-026
Entity Name
Ranger Construction
Subject
Contract for Dune Restoration Project
Project Number
IRC-3041
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />40 <br />14.4 ENGINEER will, within ten (10) days after receipt of each application for Payment, either <br />indicate in writing a recommendation of payment and present the Application to OWNER, <br />G or return the Application to CONTRACTOR indicating in writing ENGINEER's reasons for <br />refusing to recommend payment. In the latter case, CONTRACTOR may make the necessary <br />corrections and resubmit the Application. Ten (10) days after presentation of the Application <br />f for Payment with ENGINEER's recommendation, the amount recommended will (subject to <br />the provisions of the last sentence of paragraph 14.7) become due and when due will be paid <br />by OWNER to CONTRACTOR. <br />t <br />14.5 ENGINEER's recommendation of any payment requested in an Application for Payment will <br />constitute a representation by ENGINEER to OWNER, based on ENGINEER's on-site <br />observations of the Work in progress as an experienced and qualified design proff-sional and <br />on ENGINEER's review of the Application for Payment and the accompanying data and <br />1 . schedules that the Work has progressed to the point indicated; that, to the best of <br />ENGINEER's knowledge, information and belief, the quality of the Work is in accordance <br />with the Contract Documents (subject to an evaluation of the Work as a functioning whole <br />prior to or upon Substantial Completion, to the results of any subsequent tests called for in <br />_ the Contract Documents, to a final determination of quantities and classifications for Unit <br />Price Work under paragraph 9.10, and to any other qualifications stated in the <br />recommendation); and that CONTRACTOR is entitled to payment of the amount <br />recommended. However, by recommending any such payment ENGINEER will not thereby <br />be deemed to have represented that exhaustive or continuous on-site inspections have been <br />made to check the quality or the quantity of the Work beyond the responsibilities specifically <br />assigned to ENGINEER in the Contract Documents or that there may not be other matters or <br />issues between the parties that might entitle CONTRACTOR to be paid additionally by <br />OWNER or OWNER to withhold payment to CONTRACTOR. <br />14.6 ENGINEER's recommendation of final payment will constitute an additional representation <br />i..: <br />by ENGINEER to OWNER that the conditions precedent to CONTRACTOR's being entitled <br />to final payment as set forth in paragraph 14.13 have been fulfilled. <br />i <br />j 14.7 ENGINEER may refuse to recommend the whole or any part of any payment if, in <br />ENGINEER's opinion, it would be incorrect to make such representations to OWNER. <br />i ENGINEER may also refuse to recommend any such payment, or, because of subsequently <br />i . discovered evidence or the results of subsequent inspections or test nullify any such payment <br />previously recommended, to such extent as may be necessary in ENGINEER's opinion to <br />protect OWNER from loss because: <br />L <br />14.7.1 The Work is defective, or completed Work has been damaged requiring <br />correction or replacement, <br />L <br />14.7.2 The Contract Price has been reduced by Written Amendment of Change <br />Order, <br />14.7.3 OWNER has been required to correct defective Work or complete Work in <br />i_ <br />accordance with paragraph 13.14, or <br />GENERAL. CONDITIONS <br />i GC36 <br />I i. <br />