Laserfiche WebLink
WWI <br />• <br />40 <br />INTRODUCTION TO BIDDER <br />1. Project Description <br />Indian River County proposes to restore coastal dunes along the Atlantic shoreline by placing <br />beach compatible sand at eight(8) sites. The placement of material shall be consistent with <br />the Florida Department of Environmental Protection (FDEP) permit number IR -601. The <br />project is being partially funded through the Federal Emergency Management Agency <br />(FEMA) Disaster Relief Funding Agreement number 00-RM-xx-10-40-01-004. Both <br />documents can be found in the Appendix. All bidders shall be familiar with the terms and <br />conditions set forth in these documents. <br />The configuration of the dunes will be a twenty (20) foot -wide crest at varying top elevations <br />based on existing site conditions. A typical section is provided for each site as shown in the <br />project drawings. Adjustments may be made to the proposed fill quantity based on existing <br />conditions at the time ofplacement. This quantity adjustment, if necessary, will only reduce <br />the fill placement volume. <br />2. Location of Project <br />The dune restoration sites are located throughout the County shoreline as shown by the plans. <br />A location map is attached identifying each site, but specific site information can be found <br />in the project drawings. Listed below is a table indicating each of the site placement <br />characteristics. <br />Site No. <br />FDEP Monument Location <br />Unit Volume <br />(c/ft <br />Length <br />ft <br />Total Volume <br />c <br />1 <br />R12 (+200ft) to R16(+350ft) <br />6.0 <br />4,300 <br />25,900 <br />2 <br />R33(-200ft) to R34 <br />8.6 <br />1,000 <br />8,580 <br />3 <br />R38(-400ft) to R38(+300) <br />7.7 <br />575 <br />4,438 <br />4 <br />R40(-400) to R40 <br />7.0 <br />550 <br />3,825 <br />5 <br />R77(+400) to R79 <br />3.4 <br />1,500 <br />5,153 <br />6 <br />R83(+150) to R83(+375) <br />4.8 <br />225 <br />1,076 <br />7 <br />R103(+250)to R103(+700) <br />5.3 <br />450 <br />2,389 <br />8 <br />R105(-200) to R107(-50) <br />5.1 <br />2,050 <br />10,438 <br />Total <br />10,650 <br />61,799 <br />Note: plus (+) indicates south of monument & mmus (-) maicates norm of monument. <br />Construction access(es) will be carefully coordinated between the awarded bidder and <br />Engineer. Several access points will be required for each site location with written consent <br />provided from the respective property owner(s) prior to the commencement. <br />The contractor shall start work at site number 8 (the southernmost site) and work north. <br />Alternately, the contractor may work at multiple sites at once as approved by the Engineer, <br />which is encouraged so to meet the project completion date of APRIL 1, 2000. <br />INTRODUCTION TO RIMERS <br />IR- 1 <br />