Laserfiche WebLink
, <br />Indian River County <br />Post Hurricanes Floyd & Irene Emergency <br />Dune Restoration Project <br />This permit application requests authorization from the Department of Environmental <br />Protection to construct a protective dune along 10,650 ft. (2.0 miles) of shoreline at eight <br />separate sites based on the Federal Emergency Management Agency (FEMA) post <br />hurricane field inspections. Individual site monument locations, volumes and lengths are <br />described in the attached tables. Approximately 60,000 cubic yards of beach compatible <br />sand will be placed on the beach at volumes ranging from 3.4 to 8.6 cubic yards per <br />linear foot. <br />The material (sand) will be from an upland source and trucked to each site. The <br />Department will be sent samples of the native and upland sand for compatibility <br />comparisons. The configuration of the protective dune will be a twenty (20) foot wide <br />crest at varying elevations based on existing conditions. A typical section is provided for <br />each site within the application. Adjustments may be made to the proposed dune feature <br />based on existing conditions at the time of construction. Coordination will be maintained <br />with the Department to ensure proper placement. Construction will begin in November <br />2000 and be completed in March 2001. <br />Site No. <br />kl� <br />Unit Volume <br />c /ft <br />Length <br />ft <br />. <br />1 <br />R12 (+200ft) to R16(+350ft) <br />6.0 <br />4,300 <br />--j-,000 <br />25,900 <br />2 <br />R33(-200ft) to R34 <br />.:. <br />-7770.1 <br />. G= <br />Indian River County <br />Post Hurricanes Floyd & Irene Emergency <br />Dune Restoration Project <br />This permit application requests authorization from the Department of Environmental <br />Protection to construct a protective dune along 10,650 ft. (2.0 miles) of shoreline at eight <br />separate sites based on the Federal Emergency Management Agency (FEMA) post <br />hurricane field inspections. Individual site monument locations, volumes and lengths are <br />described in the attached tables. Approximately 60,000 cubic yards of beach compatible <br />sand will be placed on the beach at volumes ranging from 3.4 to 8.6 cubic yards per <br />linear foot. <br />The material (sand) will be from an upland source and trucked to each site. The <br />Department will be sent samples of the native and upland sand for compatibility <br />comparisons. The configuration of the protective dune will be a twenty (20) foot wide <br />crest at varying elevations based on existing conditions. A typical section is provided for <br />each site within the application. Adjustments may be made to the proposed dune feature <br />based on existing conditions at the time of construction. Coordination will be maintained <br />with the Department to ensure proper placement. Construction will begin in November <br />2000 and be completed in March 2001. <br />Site No. <br />Monument Location <br />Unit Volume <br />c /ft <br />Length <br />ft <br />Total Volume <br />c <br />1 <br />R12 (+200ft) to R16(+350ft) <br />6.0 <br />4,300 <br />--j-,000 <br />25,900 <br />2 <br />R33(-200ft) to R34 <br />8.6 <br />8,580 <br />3 <br />R38(-400ft) to R38(+300) <br />7.7 <br />575 <br />4,438 <br />4 <br />R40(-400) to R40 <br />7.0 <br />550 <br />3,825 <br />5 <br />R77(+400) to R79 <br />3.4 <br />1,500 <br />5,153 <br />6 <br />R83(+150) to R83(+375) <br />4.8 <br />225 <br />1,076 <br />7 <br />R103(+250)to R103(+700) <br />5.3 <br />450 <br />2,389 <br />8 <br />R105(-200) to R107(-50) <br />5.1 <br />2,050 <br />10,438 <br />Total <br />10,650 <br />61,799 <br />Note: plus (+) matcates soutn or mommjnut m mill , k-1 - --- ----••• —• <br />