Laserfiche WebLink
s <br />® I PROJECT WORKSHEET REPORT <br />DECLARATION NO. FEMA -FL -DR 1300 PREPARED DATE 12/01/1999 <br />6 FIPS NO. 061.99061.00 REPORT DATE 12103/1999 14:54 <br />APPLICANT NAME INDIAN RIVER (COUNTY) (� INF <br />SUBDIVISION . NON -INF <br />I PROJECT NO. 17 VERSION 1 REF PW # O REC <br />SPECIAL CONSIDERATIONS <br />DATE <br />3 <br />Is the damaged facility or item of work located within or adjacent to a Coastal Barrier Resource System <br />Yes ® No 0, Unsure <br />i <br />Unit or an Otherwise Protected Area? <br />p 4 <br />Will the proposed facility repairslreconstruclion change the pre -disaster conditions (e.g.. footprint, <br />-` Yes 0 No 0 Unsure <br />END DT <br />material, location, capacity,use or function)? <br />00100/0000 <br />5 <br />Does the applicant have a hazard mitigation proposal or would the applicant like technical assistance <br />1. Yes ® No Q Unsure <br />{ <br />for a hazard mitigation proposal? <br />6 <br />Is the damaged facility on the National Register of Historic Places or the stale historic listing? Is it older <br />.^i yes ®No 0 Unsure <br />than 50 years? Are there more,similar buildings near the site? <br />f <br />I 7 <br />Are there any pristine or undisturbed areas on, or near, the project site? Are there large tracts of <br />O Yes • No O Unsure <br />forestland? <br />8 <br />Are there any hazardous materials at or adjacent to the damaged facility and/or item of work? <br />O Yes • No Q Unsure <br />g <br />Are there any other environmental or controversial issues associated with the damaged facility and/or <br />^ Yes 0 No O Unsure <br />r <br />item of work? <br />PW REQUIRED REVIEWS <br />REVIEW ASSIGNED DATE <br />DATE <br />REVIEW STATUS RECOMMENDATION REVIEWER REVIEWER SUBMITTED <br />REVIEWED <br />Initial Submitted 12/03/1999 <br />Final Submitted 12/03/1999 <br />PW ASSIGNMENTS <br />t <br />SPECIALIST TITLE BEGIN DT <br />END DT <br />KING, WILLIAM PROJECT OFFICER (IS) 12/03/1999 <br />00100/0000 <br />GENERAL COMMENTS <br />I DAMAGE DESCRIPTION AND DIMENSIONS: STORM SURGE FROM HURRICANE FLOYD CAUSED BEACH EROSION <br />TOTALLING 41,028CY WHICH WILL REQUIRE COMPACTION @.22%. THEREFORE, 41,028 CY X.22% = 9,026 CY. <br />SCOPE OF WORK: COMPACT BERM. ADDITIONAL SAND MATERIAL (APPROX. 22%) REQUIRED TO CONSTRUCT <br />I <br />BERM TO DESIGN CROSS-SECTIN , ELEVATION SPECIFICATIONS, PER VER. #1. A & E. PROJECT MGMT. @10 % <br />j , PERMITTING. <br />