My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-026
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 10:40:12 AM
Creation date
2/20/2025 10:34:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/30/2001
Control Number
2001-026
Entity Name
Ranger Construction
Subject
Contract for Dune Restoration Project
Project Number
IRC-3041
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-3. <br />40 <br />inspection, reference standard, test or approval referred to in the Contract Documents, or has been <br />! damaged prior to ENGINEER'S recommendation of final payment (unless responsibility for the <br />protection thereof has been assumed by OWNER at Substantial Completion in accordance with <br />paragraph 14.8 or 14.10). <br />Drawings - The drawings which show the character and scope of the Work to be performed and <br />which have been prepared or approved by ENGINEER and are referred to in the Contract Documents. <br />Effective Date of the Agreement - The date indicated in the Agreement on which it becomes effective, <br />but if no such date is indicated it means the date on which the Agreement is signed and delivered by <br />the last of the two parties to sign and deliver. <br />ENGINEER - The person, firm or corporation named as such in the Supplementary Conditions. <br />1: <br />Field Order - A written order issued by ENGINEER which orders minor changes in the work in <br />accordance with paragraph 9.5 but which does not involve a change in the Contract Price or the <br />t , Contract Time. <br />General Requirements - Sections of Division 1 of the Specifications. <br />r <br />Laws and Regulations; Laws or Regulations - Laws, rules, regulations, ordinances, codes and/or <br />orders. <br />Notice of Award - The written notice by OWNER to the apparent successful bidder stating that upon <br />compliance by the apparent successful bidder with the conditions precedent enumerated therein, <br />within the time specified, OWNER will sign and deliver the Agreement. <br />r <br />L <br />Notice to Proceed - A written notice given by OWNER to CONTRACTOR (with a copy to <br />ENGINEER) fixing the date on which the Contract Time will commence to run and on which <br />CONTRACTOR shall startto perform CONTRACTOR'S obligations under the Contract Documents. <br />OWNER - The public body or authority, corporation, association, firm or person with whom <br />CONTRACTOR has entered into the Agreement and for whom the Work is to be provided. <br />Partial Utilization - Placing a portion of the Work in service for the purpose for which it is intended <br />(or a related purpose) before reaching Substantial Completion for all the Work. <br />Project - The total construction ofwhich the Work to be provided under the Contract Documents may <br />be the whole, or a part as indicated elsewhere in the Contract Documents. <br />Resident Project Representative - The authorized representative of ENGINEER who is assigned to <br />the site or any part thereof. <br />Shop Drawing - All drawings, diagrams, illustrations, schedules and other data which are specifically <br />prepared by or for CONTRACTOR to illustrate some portion of the Work and all illustrations, <br />GENERAL CC +TIONS <br />GC2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.