My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-026
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 10:40:12 AM
Creation date
2/20/2025 10:34:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/30/2001
Control Number
2001-026
Entity Name
Ranger Construction
Subject
Contract for Dune Restoration Project
Project Number
IRC-3041
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />40 <br />40 <br />L] <br />2.6 Within ten (10) days after the Effective Date of the Agreement (unless otherwise specified in <br />the General Requirements), CONTRACTOR shall submit to ENGINEER for review: <br />E% <br />I 2.6.1 An estimated progress schedule indicating the starting and completion dates <br />of the various stages of the Work; <br />c <br />2.6.2 A preliminary schedule of Shop Drawing submissions; and <br />i <br />2.6.3 A preliminary schedule of values for all of the Work which will include <br />quantities and prices of items aggregating the Contract Price and will <br />subdivide the Work into component parts in sufficient detail to serve as the <br />i basis for progress payments during construction. Such prices will include an <br />appropriate amount of overhead and profit applicable to each item of Work <br />which will be confirmed in writing by CONTRACTOR at the time of <br />submission. <br />2.7 Ten (10) days prior to any work commencing, CONTRACTOR shall deliver to OWNER, <br />with a copy to ENGINEER, certificates (and other evidence of insurance requested by <br />OWNER) which CONTRACTOR is required to purchase and maintain in accordance with <br />Section 5. <br />Preconstruction Conference: <br />2.8 Within twenty (20) days after the Effective Date of the Agreement, but before <br />CONTRACTOR starts the Work at the site, a conference attended by CONTRACTOR, <br />ENGINEER and others as appropriate will be held to discuss the schedules referred to in <br />paragraph 2.6, to discuss procedures for handling Shop Drawings and other submittals and <br />for processing Applications for Payment, and to establish a working understanding among the <br />parties as to the Work. <br />Finalizing Schedules: <br />2.9 At least ten (10) days before submission of the first Application for Payment a conference <br />attended by CONTRACTOR, ENGINEER and others as appropriate will be held to finalize <br />the schedules submitted in accordance with paragraph 2.6. The finalized progress schedule <br />will be acceptable to ENGINEER as providing an orderly progression of the Work to <br />completion within the Contract Time, but such acceptance will neither impose on ENGINEER <br />responsibility for the progress or scheduling of the Work nor relieve CONTRACTOR from <br />full responsibility therefor. The finalized schedule of Shop Drawing submissions will be <br />acceptable to ENGINEER as providing a workable arrangement for processing the <br />submissions. The finalized schedule of values will be acceptable to ENGINEER as to form <br />and substance. <br />' ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE <br />Intent: <br />GENERAL CONDITIONS <br />. GG5 <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.