40 <br />40 <br />410 <br />and contact with Utilities, to determine the exact locations and type of existing facilities, <br />service connections, irrigation pipes, and traffic signal wiring prior to commencing work in <br />the area and shall be responsible for any damage thereto. <br />4.7 With regard to paragraph 6.25, damage, injury, or loss resulting in whole or in part from the <br />CONTRACTOR's failure to locate and preserve a facility, service connection, irrigation pipe, <br />or traffic signal wiring shall under no circumstances be deemed attributable to the fault of the <br />Drawings or Specifications or to the acts or omissions of the OWNER or ENGINEER or <br />anyone employed by either of them or anyone for whose acts either of them may be liable. <br />4.8 With respect to underground facilities, no claim for a change in the contract price may be <br />allowed unless the CONTRACTOR discovers an underground facility which is not indicated <br />or referred to in the Contract Documents or which is in a position differing materially and <br />significantly from that indicated or referred to in the Contract Documents. If such discovery <br />j is made, the CONTRACTOR shall promptly notify in writing the OWNER, ENGINEER and <br />the Utility. The OWNER may make changes in the alignment and grade of the work in <br />accordance with the section titled "Changes in the Work". <br />4.9 At no additional cost to the OWNER, the CONTRACTOR shall replace, remove, relocate, <br />protect, or temporarily maintain a facility which is not in a position differing materially and <br />significantly from that indicated or referred to in the Contract Documents. At no additional <br />cost to the OWNER, the CONTRACTOR shall adjust the top elevation of all valve boxes and <br />manholes to match the finish grade or pavement surface and shall replace, remove, relocate, <br />protect, or temporarily maintain all service connections, irrigation pipes, and traffic signal <br />wiring. The work on the facility, service connection, irrigation pipe or traffic signal wiring <br />shall be done in a manner satisfactory to the Utility, it being understood that the Utility has <br />the option of doing such work with his own forces, or permitting the work to be done by the <br />CONTRACTOR. <br />., <br />Reference Points: <br />4.10 OWNER shall provide engineering surveys to establish reference points for construction <br />which in ENGINEER's judgment are necessary to enable CONTRACTOR to proceed with <br />the Work. CONTRACTOR shall be responsible for laying out the Work (unless otherwise <br />specified in the General Requirements), shall protect and preserve the established reference <br />points and shall make no changes or relocations without the prior written approval of <br />OWNER. CONTRACTOR shall report to ENGINEER whenever any reference point is lost <br />�- or destroyed or requires relocation because of necessary changes in grades or locations, and <br />shall be responsible for the accurate replacement or relocation of such reference points by <br />professionally qualified personnel. <br />L <br />ARTICLE 5 - BONDS AND INSURANCE <br />Performance and Other Bonds: <br />GENERAL CONDITIONS <br />GC9 <br />