My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-030
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 10:54:25 AM
Creation date
2/20/2025 10:54:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/13/2001
Control Number
2001-030
Subject
Change Order 3 for Shooting Range Buildings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C_ <br />40 <br />40 <br />INDIAN RIVER COUNTY, FLORIDA <br />CHANGE ORDER NO. 3 U' _ 30 <br />PROJECT NO: 9629B PROJECT: Shooting Range - Buildings <br />CONTRACTOR: William Glover, Inc. <br />286 N. Babcock Street <br />Melbourne, FL 32935 <br />DATE OF ISSUANCE: <br />ITEM DESCRIPTION OF CHANGE QTY. UNIT UNIT PRICE PRICE <br />NO. PRICE INCRFASF nFCRFASF <br />Provide astaircase to the roof of the shotgun range. <br />1 <br />LS <br />$2,982.00 <br />$2,982.00 <br />Provide a new steel deflector along the entire fascia of <br />the istol ran a firin line cover. <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />Provide rafters at 1' spacing under steel panels on pistol <br />r5Band rifle ran a firin line covers. <br />1 <br />LS <br />$2,339.00 <br />$2,339.00 <br />Provide four additional benches on the pistol range. <br />1 <br />LS <br />$492.00 <br />$492.00 <br />7A Reconstruct the H/C firing points on rifle and pistol <br />ranges to include ramps and standard height benches. <br />1 <br />LS <br />$1,760.00 <br />$1,760.00 <br />76 Reconstruct the 200 -yard firing points on the rifle range <br />to be centered in the 12' bays. <br />1 <br />LS <br />$414.00 <br />$414.00 <br />7C Provide four additional benches on the rifle range. <br />1 <br />LS 1 <br />$492.00 <br />$492.00 <br />19 Provide a second baffle on the pistol range <br />1 <br />LS <br />$16,686.00 <br />$16,686.00 <br />19A Reconstruct the partially completed baffle #1 on pistol <br />range; place the bottom at 8'-1/2" above the floor. <br />1 <br />LS <br />$1,064.00 <br />$1,064.00 <br />19B Reconstruct the partially completed baffle #1 on the rifle <br />range to provide a bottom as per the original design. <br />1 <br />LS <br />$1,350.00 <br />$1,350.00 <br />19C Add 8" to the bottom of baffles #3 & #4 on rifle range. <br />1 <br />LS <br />$4,291.00 <br />$4,291.00 <br />19D Delete 16" from the bottom of baffle #5 on rifle range. <br />1 <br />LS <br />$3,102.00 <br />($3,102.00) <br />19E Delete the 2x8 at the top of all baffles. <br />1 <br />LS <br />$1,176.00 <br />($1,176.00) <br />19F Use 2x6 Tongue and Groove material on the front sides <br />of all baffles. <br />1 <br />LS <br />$4,077.00 <br />$4,077.00 <br />22 Delete wooden range rules sign. <br />1 <br />LS <br />$790.50 <br />($790.50) <br />29 Extend underground service connections to the pull 1 <br />boxes installed by FPL. Also, provide a weather proof <br />outlet at the golf cart parking pad. <br />1 <br />LS <br />$2,657.00 <br />$2,657.00 <br />Subtotals= <br />Net Change = <br />$41,104.00 ($5,068.50) <br />$36,035.50 <br />ORIGINAL CONTRACT PRICE/TIME <br />CURRENT CONTRACT PRICE/TIME AS <br />ADJUSTED BY PREVIOUS CHANGE ORDERS <br />NET CHANGE IN CONTRACT PRICE/TIME <br />DUE TO THIS CHANGE ORDER <br />NEW CONTRACT PRICE/TIME INCLUDING <br />THIS CHANGE ORDER <br />NEW CONTRACT COMPLETION DATE <br />$609,248.71 120 DAYS <br />$535,636.57 129 DAYS <br />$36,035.50 36 DAYS <br />$571,672.07 165 DAYS <br />F:\\Public Works\Capital Projects\Shooting Range\Buildings\changeorder3 <br />February 17, 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.