My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-031
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 10:58:58 AM
Creation date
2/20/2025 10:58:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/13/2001
Control Number
2001-031
Subject
Amendment 2 for Professional Service Agreement for
Applied Technology & Management for Design & Permitting
Scope of Servoces and Compensation for IRC Beach Preservation Projects
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />Scope of Work <br />Page 7 <br />the vibracores collected in 1999) will be determined subsequent to the refinement of <br />0 the cut boundaries of each of the borrow areas. <br />Task 1.A.11 Establish Erosion Control Line for Sectors 1 and 2 <br />Prior to the placement of beachfill acquired from sovereignty submerged lands in the <br />state of Florida, the FDEP requires that local interests establish on Erosion Control <br />Line, or ECL, for the shoreline fronting the anticipated limits of sand placement. The <br />line is established in accordance with the provisions Chapter 161.161, Florida Statues. <br />Technical (field) procedures are governed by Chapter 177, Part ll, Florida Statutes, and <br />18-5 and Chapter 21 HH -6, Florida Administrative Code. The field procedure utilized <br />essentially establishes the position of the pre -project Mean High Water shoreline over <br />the entire project construction boundary, within each sector and along the adjacent <br />non -project shorelines. <br />Timing of the survey is extremely important, as statutory limitations with respect to the <br />elapsed time between field determination of the ECL and project construction are <br />typically enforced by the state of Florida. Based on the above, meetings with the FDEP <br />and the USACE, and proposed construction schedules, the ECL survey of Sectors 1 <br />and 2 should be conducted in late February 2001. This shoreline was surveyed in <br />February 2000, and the initial field effort will be to ascertain whether modifications to <br />the February 2000 Mean High Water Line are necessary. By scheduling in this <br />timeframe, adequate time should exist for processing, approvals by the FDEP Division <br />of State Lands, Bureau of Surveying and Mapping, and the Public Hearing and <br />adoption procedures. <br />The state will require the Erosion Control Line position to be transposed onto recent <br />vertical aerial photographs of the respective project site. ATM will coordinate this <br />activity closely with Indian River County. The County's 1999 controlled vertical aerial <br />photography will be utilized to convey the Mean High Water position onto mylar for <br />submittal to the state of Florida. <br />Upon submittal of the ECL documentation of the FDEP Bureau of Surveying and <br />Mapping, ATM will conduct frequent telephone follow-up with the Title and Land <br />Records Division to ensure that processing delays are minimized. ATM shall contact <br />the FDEP to confirm: <br />• Technical sufficiency of the submitted line as surveyed; <br />• Procedural timeframes for approval; <br />• Public notification, scheduling and conduct of the Public <br />Workshop/Hearing; and, <br />• Hearing findings and Report recommending establishment of the ECL <br />(The Hearing Officer's Report is prepared within thirty days and is <br />based on public input at and subsequent to the Hearing). <br />Immediately following acceptance of the ECL position (and establishment procedures) <br />by the FDEP, ATM will aggressively pursue and assist the County and the State with <br />preparation, scheduling, pubic notification and presentation of exhibits for the Public <br />Workshop and Hearing for the proposed ECL. The state permit(s) processing for the <br />project should be nearly completed and anticipated for issuance by the FDEP prior to <br />r, IWHOOWSITEMP,RC S.a— 1 2 7 Add.. a W serves 01-184)0 tla /l r22M1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.