Laserfiche WebLink
a) Install and inflate flotation bags as needed. <br />b) Lift the vessel with barge mounted crane or similar equipment. <br />A pre -construction meeting will be held between the County and the Contractor prior to the implantation <br />of the removal process. <br />197 <br />