Laserfiche WebLink
40 <br />dD <br />4W <br />RN <br />Administrative, Project Management $ <br />Surveyor H: <br />Mission P1 i g/ G.P.S. Setup <br />Onsite ReconlLn ecti on of control <br />1,275.00 <br />Field Crew Time: <br />Establish/lAcate Horizontal- e ' al Control: <br />G.P.S./RTK location (2 units ase) <br />C&DHill <br />Segment Il & Infill <br />$ 5,415.00 <br />G.P.S. Equipment Co <br />$ 3,600.00 <br />Office (Survey <br />Pro s G.P.S. Data <br />I port to C.A.D.D.,Create/Edit TIN <br />C.A.D.D. Drawing/Volume Calculations <br />$ 740.00 <br />Total E, stinrated Cost Option "A" $15, <br />Option "B" <br />Project Management, Research, Administrative $ 1.785.00 <br />Aerial Photography (performed by others) $ 4,600.00 <br />Cross Sections utilizing G.P.S.- (Ground Truthing) $ 1,760.00 <br />Import, Process and Adjust G.P.S. Data $ 680.00 <br />Volume computations, Quantity Report and <br />C.A,D.D. drawings 3,740.00 <br />Total Estimated Cost Option "B+' $JZ565.00 <br />iISERItER1SURVEYlP00-744pldocslServicts.doc <br />