Laserfiche WebLink
40 <br />db <br />i <br />Data Development <br />All data developed as a result of this Agreement shall be developed in accordance with <br />standard formats acceptable to the Department. <br />Survey work to be performed shall meet the minimum technical standards for surveys in <br />accordance with Chapter 61G-17, Florida Administrative Cade. All monumentation set or <br />points of origin established shall be based upon those control markers designated on the <br />most recently recorded legal description of the Coastal Construction Control Line, except <br />that any First or Second order federal or state horizontal control marker may be used to <br />establish or confirm position and direction and any First, Second, or Third Order federal <br />or state vertical control marker shall be used to establish or confirm elevation. G.P.S. <br />Traverse, and Level Loop information shall be adjusted by Compass, Crandell, or Least <br />Square Method. Detailed field notes and computation records shall be kept of the survey <br />and copies shall be made available to the Department upon request. Abstracts of all <br />monumentation or points of origin shall be submitted in digital form and contain at a <br />minimum all field requirements for the Department's Monument information Tracking System. <br />All profile data shall be submitted in digital form and conform to the standard formats <br />acceptable to the Department. All information submitted shall also be in electronic <br />format, and shall be based on the 1983{1990 North American Datum and State $lane <br />Coordinate system. This information shall be submitted in a .DXF format. <br />.i <br />Attachment A, DEP Project Agreement No. 90IR1, Amendment No. 3, Page 2 of 2 <br />