My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-049
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 2:16:50 PM
Creation date
2/24/2025 2:16:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/20/2001
Control Number
2001-049
Agenda Item Number
11.G.3.
Entity Name
Brad Smith Associates, Inc.
Subject
Amendment 1 for Professional Services for the Jungle Trail Pelican Island Wildlie
Refuger
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p <br />AMMENDMENT #1 <br />SCOPE OF WORK <br />ATTACHMENT to <br />AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN <br />BRAD SMITH ASSOCIATES, INC. <br />and <br />Indian River County Board of County Commissioners <br />1820 25th St. <br />Vero Beach, Florida 32960 <br />PROJECT NAME AND LOCATION: <br />Jungle Trail/Pelican Island Refuge Enhancement Project <br />Indian River County Florida <br />SCOPE/SERVICES: <br />GENERAL: At the January 4, 2001 review meeting, it was determined that additional <br />services would be required for the project. These services include: <br />Cairns Site <br />A. Mitigation plan for wetland impacts: <br />1. Review drawings submitted to the SJRWMD and identify development and <br />mitigation areas in the field. <br />2. Identify existing wetland conditions that need improvement and the type <br />improvements that would provide the greatest wetland improvements. <br />3. Flag wetland boundaries in accordance with Chapter 62-340, F.A.C. and the <br />U.S. Army Corps of Engineers 1987 Wetland Delineation Manual. <br />4. Meet with SJRWMD to review the development wetland impacts, mitigation <br />areas, and mitigation ratios. <br />5. Prepare a mitigation plan including drawings, written narrative and tables and <br />submit the plan to the County. <br />B. Survey, Design and Permitting: <br />1) Provide additional topographic survey to include the access roadway and area <br />filled by the County for placement of the cottage. <br />2) Prepare revised design drawings and details for a stormwater management <br />system to serve the restroom, parking area and cottage area. The base plan <br />showing the layout and design of the cottage and ramp up to the cottage. <br />3) Prepare and submit a joint SJRWMD/ACOS permit application for the <br />improvements at the Cairns site. The previously prepared stormwater <br />management calculations report and exhibits will be revised to separate the <br />Attachment - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.