Laserfiche WebLink
e <br />i <br />" M Comments: — — — - - - <br />Source documentation; <br />27. SOIL STAETI:.I'lY, EROSION, AND DRAINAGE (sec EF 1.2 of Handbook 13]4.2) <br />Stopes: (x) Not Applicable ( ) Steep ( ) Moderate ( ) Slight <br />Is theta evidence of slope erosion or unstable slope eoudltioos an or near the Bits? (] Yes (X) No <br />Is then evidence of ground subsidence, high water table, or other unusual conditions on the site. <br />( )yes ()Foo <br />Is titm any visible evidence of soil problems (foundations cracking or settling, basement <br />flooding, etc.) In the neighborhood of the site? ( ) Yrs (X) No <br />Ilavc soli studies or borings been made for the project site or the tura? (} Yes () No ( Uaknovos <br />Do the soil studies or borings Indicate marginal or unsatisfactory soil conditions? ()Yes ()No <br />Is there indication of cress lot runoff, swales, drainage flows on the property? () Yes (X) No <br />Are there visual indications of [filled ground? () No ( ) Yes <br />If your answer is YES, was a 79(g) report/analysis submitted? {) Yes () No <br />Are there active rills and gullies on site? ( ) Yes (X) NO <br />If the site is not to he served by a municipal waste Mater disposal system, has a report of the soil <br />conditions suitable for an -site septic systems been submitted? ( ) Yes [) No { NA.. <br />Is it soils report (other than structural) needed? ( ) Yes ( ) No <br />Arc structural borings or a dynamic soil aunlysislgeologlcel study needed:" () Yes [) No <br />Source documentation: <br />211. Nil3SANCi S AND HAZARDS (see IFF 1.3 and 1.4 of Handbook 13911.2) <br />Will the project be affected by natural hazards - <br />8 <br />