My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-050
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 2:22:17 PM
Creation date
2/24/2025 2:20:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/20/2001
Control Number
2001-050
Agenda Item Number
11.G.4.
Entity Name
State of Florida Department of Transportation (FDOT)
Subject
Repair of Wabasso Bridge Fishing Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br />i <br />" M Comments: — — — - - - <br />Source documentation; <br />27. SOIL STAETI:.I'lY, EROSION, AND DRAINAGE (sec EF 1.2 of Handbook 13]4.2) <br />Stopes: (x) Not Applicable ( ) Steep ( ) Moderate ( ) Slight <br />Is theta evidence of slope erosion or unstable slope eoudltioos an or near the Bits? (] Yes (X) No <br />Is then evidence of ground subsidence, high water table, or other unusual conditions on the site. <br />( )yes ()Foo <br />Is titm any visible evidence of soil problems (foundations cracking or settling, basement <br />flooding, etc.) In the neighborhood of the site? ( ) Yrs (X) No <br />Ilavc soli studies or borings been made for the project site or the tura? (} Yes () No ( Uaknovos <br />Do the soil studies or borings Indicate marginal or unsatisfactory soil conditions? ()Yes ()No <br />Is there indication of cress lot runoff, swales, drainage flows on the property? () Yes (X) No <br />Are there visual indications of [filled ground? () No ( ) Yes <br />If your answer is YES, was a 79(g) report/analysis submitted? {) Yes () No <br />Are there active rills and gullies on site? ( ) Yes (X) NO <br />If the site is not to he served by a municipal waste Mater disposal system, has a report of the soil <br />conditions suitable for an -site septic systems been submitted? ( ) Yes [) No { NA.. <br />Is it soils report (other than structural) needed? ( ) Yes ( ) No <br />Arc structural borings or a dynamic soil aunlysislgeologlcel study needed:" () Yes [) No <br />Source documentation: <br />211. Nil3SANCi S AND HAZARDS (see IFF 1.3 and 1.4 of Handbook 13911.2) <br />Will the project be affected by natural hazards - <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.