My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-052
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 2:26:38 PM
Creation date
2/24/2025 2:26:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/06/2001
Control Number
2001-052
Agenda Item Number
7.V.
Entity Name
Vineyard Development Corporation
Subject
Contract request for Final Plat Approval for Vineyard Subdivision
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Road Striping 1,450.00 <br />10144 Square Yards Sub -base (8 inches thick) 24,362.00 <br />8128 Square Yards Base (6 inches thick) 35,138.00 <br />8128 Square Yards Type S-1 Asphalt (1 1/2 inches thick) 38 110.00 <br />Subtotal $170,378.00 <br />Storm Drainage <br />13 Curb Inlets <br />16,250.00 <br />8 Manholes <br />8,800.00 <br />1 Modified Type C Control Structure <br />1,100.00 <br />304 Feet 15" A.D.S. <br />3,344.00 <br />720 Feet 24" A.D.S. <br />15,768.00 <br />60 Feet 15" C.A.P. <br />980.00 <br />200 Feet 24" C.A.P. <br />5,000.00 <br />77 Feet 30" C.A.P. with Collar <br />3,205.00 <br />176 Feet 15" R.C.P. <br />4,224.00 <br />56 Feet 18" R.C.P. <br />1,378.00 <br />64 Feet 24" R.C.P. <br />2,458.00 <br />5 Collars <br />200.00 <br />Subtotal <br />$62,707.00 <br />Off Site Road Improvements <br />1124 Square Yards Coquina Base (14" thick) <br />13,240.00 <br />Excavate, Remove Existing Shoulders <br />5,100.00 <br />1124 Square Yards Type S-1 Asphalt (l 1/2" thick) <br />7,200.00 <br />Overlay 43rd Avenue Type S-3 Asphalt (1" thick) <br />17,600.00 <br />M.O.T. <br />5,000.00 <br />Stripping <br />3 4UM <br />Subtotal <br />$51,615.00 <br />Total Required Improvement Cost $500,696.45 <br />Total Bond Amount $575,800.91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.