My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-054
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 2:39:14 PM
Creation date
2/24/2025 2:38:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2001
Control Number
2001-054
Agenda Item Number
11.C.
Entity Name
Seimens BUilding Technologies
Subject
Agreement for IRC Jail Detension Electronic Phase I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />4D <br />PERFORMANCE BOND <br />KNOW All MEN BY THESE PRESENTS that as Principal, <br />hereinafter called CONTRACTOR, and , as surety, <br />hereinafter called Surety, are held and firmly bound unto INDIAN RIVER COUNTY, <br />Florida, as Obligee, herein ager called OWNER, in the amount <br />of Dollars ($ ), for the payment whereof <br />CONTRACTOR and Surety bind themselves, their heirs, executors, administrators, <br />successors and assigns, j ointly and severally, firmly by these presents. <br />WHEREAS, the CONTRACTOR has by written agreement, date , 19 <br />entered into a contract with OWNER for in accordance with <br />the specifications prepared by the OWNER, hereinafter called the Contract. <br />NOW THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if the <br />principal,. <br />1. Faithfully performs the contract at the times and in the manner prescribed in the <br />Contract; and <br />2. Promptly makes payments to all persons, including claimants as defined in Section <br />255.05(1), Florida Statutes, supplying labor, materials and equipment used directly or <br />indirectly by the said CONTRACTOR, CONTRACTORS, SUBCONTRACTOR or <br />SUBCONTRACTORS in the prosecution of the work provided for in the contract; and <br />3. Satisfies all claims and demands incurred for the same and fully indemnifies and <br />saves harmless the OWNER from all losses, damages, expenses, costs and attorney's <br />fees, including appellate proceedings, which the OWNER suffers by reason of failure to <br />do so and fully reimburses and repays the OWNFIR all outlay and expense which the <br />OWNER may incur in making good any such defect; and <br />4. Performs the guarantee of all work and materials furnished under the contract for <br />the time specified in the Contract, then this obligations shall be null and void; otherwise it <br />shall remain in full force and effect. <br />And provided that any alterations which may be made in the terms of the Contract or <br />in the work to be done under it, or the giving by the OWNER of any extension of time for <br />the performance of the Contract, or any other forbearance on <br />the part of either the OWNER or Principal to the other shall not in any way release the <br />Principal and Surety or Sureties, or either or any of them, their heirs, executors, <br />administrators, successors or assigns for their liability thereunder, notice to the Surety or <br />Sureties, of any such alteration, execution or forbearance being hereby waived. <br />
The URL can be used to link to this page
Your browser does not support the video tag.