Laserfiche WebLink
SECTION 00520 Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and Cacique Utilities, LLC, (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />Indian River County Department of Utility Services (IRCDUS) proposes to <br />construct a replacement of a portion of the sanitary force main leading to the <br />North Regional Wastewater Treatment Facility (WWTF). The project will include <br />approximately 2,400 LF of 24" PVC force main, including wet taps, line stops, <br />valves, thrust block, connections to existing lateral and plant tank, testing, and <br />restoration. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: North County 24 -inch Force Main Replacement <br />Project ID: 21.23.503 <br />UCP No.: 4163 <br />Bid Number: 2025013 <br />Project Address: 485077 th Street, Vero Beach, FL <br />ARTICLE 3 - ENGINEER <br />3.01 Bowman Consulting is hereinafter called the ENGINEER and will act as OWNER's <br />representative, assume all duties and responsibilities, and have the rights and authority <br />assigned to ENGINEER in the Contract Documents in connection with the completion of the <br />Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 120th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph 14.07 <br />