Laserfiche WebLink
WORK ORDER NUMBER 18 <br />FISCAL YEAR 2023 — 2024 FULL COST ACCOUNTING, FINANCIAL ASSURANCE <br />AND LANDFILL DEPLETION MODEL <br />EXHIBIT A <br />SCOPE OF WORK <br />PROJECT UNDERSTANDING <br />Indian River County (COUNTY) Solid Waste Disposal District (SWDD) is required to update and <br />submit the landfill closure cost estimate to the Florida Department of Environmental Protection <br />(FDEP) Solid Waste Operations Permit No. 0128769 -023 -SO Specific Condition F.2. SWDD is <br />also required to document full cost accounting and financial assurance every five years in <br />accordance with Specific Condition A.6; however, to ensure that the landfill escrow balance <br />remains on track to adequately cover the closure costs, SWDD completes the full cost accounting <br />and financial assurance process annually (without submittal to FDEP). Kimley-Horn and <br />Associates (CONSULTANT) will perform the following Scope of Services for the preparation of <br />the Full Cost Accounting Evaluation (Fiscal Year 2023-2043), Financial Assurance (FY 2024- <br />2025), and Closure Cost Estimate Update. The Scope of Services will also include the <br />incorporation of results of the survey into an update of the depletion model, developed during the <br />previous work authorization, into the Financial Assurance report or via standalone technical <br />memorandum to simulate the filling sequence of the available airspace to more accurately predict <br />the timing for construction of future cells. <br />SCOPE OF SERVICES <br />Task 1: Full Cost Accounting Evaluation for Fiscal Year 2023 - 2024 <br />In accordance with the requirements of Chapter 62-708.400(1), F.A.C., and F.S. 403.7049, the <br />COUNTY shall determine the full cost for solid waste management services. This shall include <br />the rate charged by the county or municipality to the end user for solid waste management services <br />plus any other direct, indirect or outside contractor costs associated with solid waste management <br />services. <br />CONSULTANT will prepare a draft table using information provided by the COUNTY within 60 <br />days of receipt of the data from the COUNTY. The draft public notice, summary tables and <br />working documents will be provided electronically, unless otherwise requested. The COUNTY <br />will coordinate and facilitate publication of the public notice. <br />In accordance with Chapter 403.7049 Florida Statutes: <br />"Each municipality shall establish a system to inform, no less than once a year, residential and <br />nonresidential users of solid waste management services within the municipality's service area of the <br />user's share, on an average or individual basis, ofthefull costfor solid waste management <br />Page 1 of 6 <br />