My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/17/2024
CBCC
>
Meetings
>
2020's
>
2024
>
12/17/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 10:26:11 AM
Creation date
3/6/2025 9:19:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/17/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Board of County Commissioners <br />THROUGH: John A. Titkanich, Jr., County Administrator <br />Nancy A. Bunt, Assistant County Administrator <br />Addie Javed, P.E., Public Works Director <br />Kirstin Leiendecker, P.E., Assistant Public Works Director <br />Richard Reichenbach, P.E., Project Engineer <br />FROM: Jill Williams, Contract Support Specialist <br />SUBJECT: Work Order No. 16 - Kimley-Horn and Associates, Inc. <br />Indian River Boulevard Pedestrian and Bicycle Access Improvement Project <br />(IRC -1817) <br />DATE: November 21, 2024 <br />DESCRIPTION AND CONDITIONS <br />On May 10, 2022, the Board of County Commissioners approved Work Order No. 49 with Kimley- <br />Horn and Associates, Inc. is to provide geotechnical, sidewalk, drainage and roadway design and <br />permitting services for the proposed roadway & pedestrian improvements to be made to the <br />Indian River Boulevard Corridor between the 17th Street Bridge and US -1 in the amount of <br />$268,780.00. Those services have been completed and the agreement under which Work Order 49 <br />was issued has since expired. <br />The Board approved a new continuing services agreement with Kimley-Horn under RFQ 2023015 <br />on May 2, 2023. Work Order No. 16 in the amount of $225,200.00 with Kimley-Horn & Associates, <br />Inc. is to provide post design, construction phase services for the project and for modification of <br />construction plans to improve ten (10) transit bus stops located within project limits. Also included <br />is a modification of the traffic signal at 12th St & IR Boulevard to include a flashing yellow left -turn <br />arrow. A study conducted bythe National Cooperative Highway Research Program determined that <br />drivers had fewer crashes with flashing yellow left -turn arrowsthan with traditional yield -on -green <br />signal configurations. <br />FUNDING <br />Funding in the amount of $225,200.00 for Work Order No.16 is available in Account No. 10921441- <br />066510-21021/Secondary Roads/IR Blvd Ped & Bike Access. <br />Account Name Account Number <br />Amount <br />Secondary Roads/IR Blvd Ped & Bike 10921441-066510-21021 <br />Access <br />$225,200.00 <br />55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.