My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/17/2024
CBCC
>
Meetings
>
2020's
>
2024
>
12/17/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 10:26:11 AM
Creation date
3/6/2025 9:19:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/17/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT #A <br />Indian River Boulevard Pedestrian & Bicycle Access Improvements Project <br />Construction Phase Services <br />Project ID IRC -1817 <br />PROJECT UNDERSTANDING <br />The County desires to have construction phase services provided to support improving Indian River <br />Boulevard to included dedicated bike lane and pedestrian facilities between US Highway 1 and 17th <br />Street, approximately 9,200 linear feet. In addition, the County desires to modify the construction <br />plans to improve the ten (10) transit bus stops located within the project limits. Also, the County <br />desires modify the 12th Street and Indian River Boulevard traffic signal to include a flashing yellow <br />left -turn arrow. A study conducted by the National Cooperative Highway Research Program <br />determined that drivers had fewer crashes with flashing yellow left -turn arrows than with traditional <br />yield -on -green signal configurations. <br />SCOPE OF SERVICES <br />"SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following: <br />Task 1- Construction Phase Services <br />The Consultant will provide professional construction phase assistance as specifically stated <br />below: <br />1. Clarifications and Interpretations. The Consultant will respond to reasonable and <br />appropriate Contractor requests for information and issue necessary clarifications <br />and interpretations of the Contract Documents to the COUNTY as appropriate to <br />the orderly completion of Contractor's work. Any orders authorizing variations from <br />the Contract Documents will be made by the COUNTY. <br />2. Change Orders. The Consultant may recommend Change Orders to the COUNTY and <br />will review and make recommendations related to Change Orders submitted or <br />proposed by the Contractor. <br />3. Shop Drawings and Samples. The Consultant will review and approve or take other <br />appropriate action in respect to Shop Drawings and Samples and other data which <br />Contractor is required to submit, but only for conformance with the information <br />given in the Contract Documents. Such review and approvals or other action will not <br />extend to means, methods, techniques, equipment choice and usage, sequences, <br />schedules, or procedures of construction or to related safety precautions and <br />programs. Shop drawings, samples or certifications are anticipated to be submitted <br />related to the following: <br />Page 1 of 5 <br />58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.