My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-034
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:07:26 PM
Creation date
3/13/2025 1:06:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/11/2025
Control Number
2025-034
Agenda Item Number
9.P.
Entity Name
Ecological Associates Inc
Subject
Work Order 04 for HCP Sea Turtle Monitoring 2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />Mr. Quintin Bergman <br />Indian River County Coastal Division <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />Dear Mr. Bergman: <br />A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />WIAN L. BUTLER, CLERK <br />ZA <br />,,,Y- ECOLOGICAL ASSOCIATES, INC. <br />January 29, 2025 <br />Ecological Associates, Inc. (EAI) is pleased to submit its revised Scope of Work and Cost <br />Proposal for providing professional environmental services to Indian River County. All <br />conditions related to this proposal shall be governed under EAI's Continuing Contract <br />Agreement for Consulting Environmental, Ecological, and Biological Support Services <br />with the County dated September 26, 2023. <br />The new task is for sea turtle monitoring along approximately 8_2 miles of beach in support <br />of the County's Habitat Conservation Plan during the 2025 sea turtle nesting season, as <br />described in the Scope of Work presented below. This monitoring will provide baseline <br />data for future beach nourishment projects and support long-term monitoring efforts for <br />sea turtles along the County's beaches. <br />Scope of Work: <br />Task 1: Project Management and Mobilization <br />The Survey Area consists of an approximately 0. 6 -mile northern section (EW R-17 <br />to R-20) and an approximately 7.6 -mile southern section (R-70 to R-86 and R-96 to <br />the Indian Riverl& Lucie County Line). Pre-existing survey zone boundaries will be <br />verified and re -marked, and project -specific data sheets and a database will be created. <br />EAI will install signs, posts, and hardware provided by the County using centimeter <br />accurate RTK units. An EAI project manager will oversee all fieldwork and data <br />management operations, participate in weekly check-in meetings with the County, and <br />consult with the County on monitoring requirements, as necessary. A project schedule, <br />as well as field survey schedules, will be created and maintained throughout the life of <br />the project. All equipment and supplies necessary to successfully implement this Scope <br />of Work are available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.