Laserfiche WebLink
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK <br />Indian River County Work Order Number — 2023051-5 <br />Sector 4 Dune Restoration Project Exhibit 1 - Scope of Work <br />Exhibit 1 - Scope of Work <br />Sector 4 Dune Restoration Project - Immediate Post -Construction Monitoring <br />Introduction: Indian River County (COUNTY) engaged a contractor to restore the dune within Sector <br />4 (Project) - consistent with the "Indian River County Beach Preservation Plan Update", adopted by <br />the COUNTY in June 2020. The Project limits extend from Florida Department of Environmental <br />Protection (FDEP) Reference Monument R-55 (about 3/a mile south of the Turtle Trail Beach Access) <br />to just south of R-70 (near Mariner Beach Lane north of the County's Tracking Station Beachfront <br />Park). The FDEP and U.S. Army Corps of Engineers (USACE) permits include conditions that require <br />the COUNTY (as PERMITTEE) to perform monitoring immediately (within same calendar year) after <br />construction — as identified in the U.S. Fish and Wildlife Service (USFWS) "Revised Statewide <br />Programmatic Biological Opinion" (SPBO) dated March 13, 2015. This Work Order is to provide for <br />immediate post -construction physical and biological monitoring services in support of the Project <br />as required by the FDEP and USACE permits. The work under this Work Order is proposed to be <br />performed by Coastal Technology Corporation (COASTAL TECH) with environmental support <br />services by Ecological Associates, Inc. (EAI) - as described below: <br />Task 1 - Survey & Report: As required by FDEP Specific Condition 28 and the FDEP approved <br />Physical Monitoring Plan dated October 12, 2023: <br />• The COUNTY will provide the Post -Construction beach profile survey following the <br />completion of the construction of the Project. <br />• COASTAL TECH will: <br />o review the 2025 Post -Construction beach profile survey for compliance with the <br />Physical Monitoring Plan; <br />o conduct an analysis of the following: <br />■ patterns, trends, or changes between annual surveys and for cumulative <br />changes overtime, <br />■ the erosion and accretion volumetric change rates and shoreline changes <br />between the pre and post -construction survey, with assessment of the <br />volume of fill remaining within the Project area, and <br />■ adjustment of the beach fill via alongshore and cross- shore fill movement — <br />including outside of the Project fill area. <br />o prepare an "Engineering Report" summarizing results of the analysis. <br />Page 1 of 3 <br />January 23, 2025 <br />