My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-038
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:41:59 PM
Creation date
3/13/2025 1:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/11/2025
Control Number
2025-038
Agenda Item Number
9.U.
Entity Name
Consor North America, Inc.
Subject
Engineering Work Order No. 01 for 43rd Ave Bike & Pedestrian Improvements (12th St – 16th St.)
43rd Ave (14th Land & 15th Place Resurfacing) IRC-1818A
Project Number
IRC-1818
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Additional Personnel Qualifications <br />a. FDOT Advanced MOT <br />RFQ 2023015 - Continuing Engineering Consulting Services <br />Consor North America, Inc. <br />IRC -1818 & IRC -1818A CEI Services <br />b. CTQP Quality Control Manager -attend class and pass the examination. <br />c. CTQP Final Estimates: Level I <br />d. CTQP Final Estimates: Level II <br />e. CTQP Concrete Field Inspector: Level I <br />f. CTQP Concrete Field Inspector: Level II (Bridges) <br />g. CTQP Asphalt Roadway: Level I <br />h. CTQP Asphalt Roadway: Level II <br />i. CTQP Earthwork Construction Inspection: Level I <br />j. CTQP Earthwork Construction Inspection: Level 11 <br />k. CTQP Drilled Shaft Inspection (required for inspection of all drilled shafts including <br />miscellaneous structures such as sign structures, lighting structures, and traffic signal <br />structu res) <br />I. IMSA Traffic Signal Inspector: Level I <br />Deliverables <br />The Engineer shall prepare and submit the following: <br />1. Construction Completion Package containing the following: <br />a. Dated final as -built schedule, time file and daily work reports. <br />b. Field survey/geotechnical verification data provided to Engineer by the contractor. Final <br />as -built plans provided to Engineer by the contractor. <br />c. Final as -built plans provided to Engineer by the contractor. <br />d. Documentation of progress meetings, public informational meetings, and any other <br />pertinent project meetings with dates and notes. <br />e. Documentation of all field decisions which caused any deviation from the plans and/or <br />specifications. <br />f. Signed and Sealed test results. <br />g. Documentation of progress payments and final payment to the contractor. <br />h. Copies of all RFIs and responses. <br />i. Copies of all executed changes to the contract. <br />j. Copies of the final inspection punch lists with dates of item resolution. <br />k. All other project records. <br />2. Thumb Drive containing electronic copy of all deliverables noted above in PDF format. <br />3. Final as -built plans in AutoCAD (2015 version or newer), PDF and hard copy formats as provided <br />by the contractor. <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.