Laserfiche WebLink
Item Number <br />Item <br />Quantity Required Unit <br />Unit Price Totals <br />«1-1 <br />T -Dock Rebuild <br />1 Lump Sum <br />37000 $37,000.00 <br />#1-2 <br />Permits <br />1 Lump Sum <br />1200 $1,200.00 <br />#1-3 <br />5'4X4 post to be installed between pilings to support railings <br />49 each <br />70 $3,430.00 <br />#1-4 <br />2X8 blocking to support the 4X4 post <br />186 LF <br />20 $3,720.00 <br />#1-5 <br />Stringer Replacement (if needed) <br />248 LF <br />8.75 $2,170.00 <br />#1-6 <br />Cross Member Replacement (if needed) <br />160 LF <br />15 $2,400.00 <br />#1-7 <br />Piling Replacement (if needed) <br />80 LF <br />55 $4,400.00 <br />' ► <br />.4'. <br />S'< k <br />�,��$54,320.00 <br />#2-1 - <br />.... <br />.fir , <br />T -Dock Rebuild w/Fibergrate MicroMesh Decking (including additional structural components required to support decking) <br />1 Lump Sum <br />79000 $79,000.00 <br />#2-2 <br />Permits <br />1 Lump Sum <br />1200 $1,200.00 <br />#2-3 <br />5'4X4 post to be installed between pilings to support railings <br />49 each <br />70 $3,430.00 <br />#2-4 <br />2X8 blocking to support the 4X4 post <br />186 LF <br />20 $3,720.00 <br />#2-5 <br />Stringer Replacement (if needed) <br />248 LF <br />8.75 $2,170.00 <br />#2-6 <br />Cross Member Replacement (if needed) <br />160 LF <br />15 $2,400.00 <br />#2-7 <br />Piling Replacement (if needed) <br />80 LF <br />55 $4,400.00 <br />$96,320.00 <br />