My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-047
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 2:39:34 PM
Creation date
3/27/2025 12:43:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/25/2025
Control Number
2025-047
Agenda Item Number
9.D.
Entity Name
Indian River Docks, Inc.
Subject
Agreement for Donald MacDonald Campground T-Dock Rebuild 12315 Roseland Blvd Sebastian
Bid Number
BID No. 2025021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item Number <br />Item <br />Quantity Required Unit <br />Unit Price Totals <br />«1-1 <br />T -Dock Rebuild <br />1 Lump Sum <br />37000 $37,000.00 <br />#1-2 <br />Permits <br />1 Lump Sum <br />1200 $1,200.00 <br />#1-3 <br />5'4X4 post to be installed between pilings to support railings <br />49 each <br />70 $3,430.00 <br />#1-4 <br />2X8 blocking to support the 4X4 post <br />186 LF <br />20 $3,720.00 <br />#1-5 <br />Stringer Replacement (if needed) <br />248 LF <br />8.75 $2,170.00 <br />#1-6 <br />Cross Member Replacement (if needed) <br />160 LF <br />15 $2,400.00 <br />#1-7 <br />Piling Replacement (if needed) <br />80 LF <br />55 $4,400.00 <br />' ► <br />.4'. <br />S'< k <br />�,��$54,320.00 <br />#2-1 - <br />.... <br />.fir , <br />T -Dock Rebuild w/Fibergrate MicroMesh Decking (including additional structural components required to support decking) <br />1 Lump Sum <br />79000 $79,000.00 <br />#2-2 <br />Permits <br />1 Lump Sum <br />1200 $1,200.00 <br />#2-3 <br />5'4X4 post to be installed between pilings to support railings <br />49 each <br />70 $3,430.00 <br />#2-4 <br />2X8 blocking to support the 4X4 post <br />186 LF <br />20 $3,720.00 <br />#2-5 <br />Stringer Replacement (if needed) <br />248 LF <br />8.75 $2,170.00 <br />#2-6 <br />Cross Member Replacement (if needed) <br />160 LF <br />15 $2,400.00 <br />#2-7 <br />Piling Replacement (if needed) <br />80 LF <br />55 $4,400.00 <br />$96,320.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.