My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-059
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 10:55:18 AM
Creation date
3/31/2025 10:54:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
03/11/2025
Control Number
2025-059
Agenda Item Number
9.M.
Entity Name
Florida Design Drilling, Inc.
Subject
Change Order No. 1 for Upper Floridian Aquifer South Well No, 1 Replacement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />No. 1 <br />PROJECT: South Oslo WTP Well S-1 Replacement (S-1 R) <br />DATE OF ISSUANCE: 2/20/2025 EFFECTIVE DATE: <br />OWNER: Indian River County <br />OWNER's Contract No.: 2024024 Project No.: 044572106 <br />CONTRACTOR: Florida Design Drilling Corp. ENGINEER: Kimley-Horn & Associates, Inc. <br />You are directed to make the following changes in the Contract Documents: <br />Description: Drilling and construction is complete on the above referenced project. This change order serves to <br />deduct the remaining unused $314,175 from the contract value. <br />Reason for change order: Project closeout. <br />Attachments: Final Pavment Application <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIME <br />Original Contract Price <br />Original Contract Times: <br />$ 1,931,250 <br />Substantial Completion: 0 <br />Ready for final payment: 0 <br />Net changes from previous Change Orders <br />Net change from previous Change Orders: <br />No. to No. <br />No. to No. <br />Contract Price prior to this Change Order <br />Contract Time prior to this Change Order <br />$ 1,931,250 <br />Substantial Completion: 300 <br />Ready for final payment: 330 <br />Das or dates <br />Net Increase (decrease) in this Change Order <br />Net Increase in this Change Order <br />$ (314,175) <br />0 days <br />Contract Price with all approved Change <br />Contract Time with all approved Change <br />Orders <br />Orders <br />$ 1,617,075 <br />Substantial Completion: 300 <br />Ready for final payment: 330 <br />Days or a es <br />RECO END D: <br />By: <br />� <br />ngineer (Authorized Signatufe) <br />," &AC"A, A.E. <br />APPROVED: <br />By: <br />Owner (Authorized Signature) <br />ACCEPTED: <br />Contractor (Authorized Signature) <br />Date: Z- ZO -2 �5' Date: Date: 2/20/2025 <br />Brandon K. Holst, Vice President <br />EJCDC No. C-700 (2002 Edition) Florida Design Drilling LLC <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated <br />General Contractors of America. <br />00800-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.