Laserfiche WebLink
January 15, 2025 <br />IRC EOC Expansion — Plan for Future 2nd Floor <br />Page 2of3 <br />The general terms and conditions for the contract executed on 01-18-2023 are applicable to this authorization. <br />Any additional work not included in the above scope of work shall be charged per the Rate Schedule, attached. <br />Reimbursable expenses include job site meetings, field observations, shipping and printing costs for distribution of <br />drawings for permitting, bidding and/or construction. <br />If the information contained herein is consistent with your understanding, please countersign or have this form <br />countersigned by the appropriate person. This signature shall constitute an acknowledgement of an authorization to <br />proceed with this work. <br />Jenkins and Charland, Inc. Accepted and Authorized: <br />dba TRC Worldwide Engineering <br />Nom"/' <br />Signature <br />Nitin Ranadive P.E., Princi <br />Printed Name <br />Date: 01-15-2025 <br />Enclosed: Rate Schedule <br />Date: <br />Signature <br />Printed Name <br />JAProjects\Projects-2023\001 - FTL Design\23FTL001-IRC EOC Expansion\CONTRACTS\2025.01.15_IRC EOC Exp - Plan for Future 2nd Story - Revised.docx <br />Please Initial 7 ;;;�' C <br />WORLDWIDE ENGINEERING <br />