My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-068
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 2:23:04 PM
Creation date
4/14/2025 2:21:03 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/25/2025
Control Number
2025-068
Agenda Item Number
9.N.
Entity Name
CPZ Architects, Inc.
Subject
Work Order No.1 for IRC Administration Building B 2nd Floor East Side Office Build Out
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 0 • <br />00'0: cMTA <br />14 February 2025 <br />Mr. Chris P. Zimmerman, AIA <br />President <br />CPZ Architects, Inc. <br />4316 West Broward Boulevard <br />Plantation, FL 33317 <br />Building Science Leadership <br />Re: Professional Services Fee Proposal - MEPFP Design Engineering <br />Indian River County - Administration Building "B" <br />Natural Resources Department - Renovation <br />1800 27th Street <br />Vero Beach, FL 32960 <br />Dear Chris: <br />We are pleased to present you with our fee proposal for the above referenced <br />project. Following, is our scope of work and compensation for the project. Should <br />you find our fee proposal to be acceptable, please sign and return a copy for our <br />files. <br />Project Description / Scope of Work: <br />The project will be a 2nd floor tenant improvement of 10,000sf±. Our scope of work <br />will be to rework existing Mechanical, Electrical, Plumbing and Fire Prevention <br />systems in an effort to build out the 10,000sf± for office space, design for new male <br />and female restrooms, design for a new connecting corridor and a new conference <br />room. <br />Our scope of work will include the following items: <br />Mechanical Engineering: <br />• Design Engineering for HVAC Design and Distribution to support the new <br />2nd Floor Office Layout. <br />Electrical Engineering: <br />• Design Engineering for Electrical Power Distribution and Circuiting. <br />• Design Engineering for Lighting, Switching and Controls. <br />CMTA Maitland Office <br />600 South Maitland Avenue Maitland, FL 132751 <br />NIEP Engineering I Performance Contracting I Zero Fneroy Engineei-mg I Technoluy l;unur,i,;,�nin <br />
The URL can be used to link to this page
Your browser does not support the video tag.