My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-069
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 2:28:00 PM
Creation date
4/14/2025 2:26:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/25/2025
Control Number
2025-069
Agenda Item Number
9.O.
Entity Name
CPZ Architects, Inc
Subject
Work Order No. 2 for IRC Administration Building Property Appraisers Office Renovation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CMTA <br />Building Science Leadership <br />Mechanical Engineering <br />• Design Engineering to rework distribution to support the new lobby area, <br />new office spaces, rework of existing office space, new office space, new <br />conference room and a rework of existing conference room. <br />Electrical Engineering <br />• Design Engineering for distribution of Electrical Power. <br />• Design Engineering for Lighting and Switching. <br />• LV Design for Telecom and Data Device Locations, Back Boxes and Cable <br />Routing. (Headend Room Is Existing) <br />• Coordination with Specialty Equipment Vendors, Cut Sheets. <br />Scope of Services: <br />Our Scope of Work and Services will include the following: <br />1. All Design Team Meetings, via Teams. <br />2. Electrical Specifications and Construction Documents (Revit (BIM) or <br />AutoCAD). <br />3. Design Documents, Reviews and Responses for: <br />• Construction Documents <br />• Permitting <br />• Bid Assistance <br />• Construction Administration — Responses to contractor RFI's, Shop <br />Drawing Review (No More Than 2 Reviews) and a final punch. <br />Compensation for Services: <br />Our base design fee for this new project will be Sixteen Thousand Six Hundred <br />Twenty -Five Dollars ($16,625.00) plus customary reimbursable expenses. <br />We would anticipate our billing schedule would be as follows: <br />• Schematic Design & Existing Conditions $1,760.00 <br />• Design Development $4,356.00 <br />• Construction Drawings $3,940.00 <br />• Permitting $ 760.00 <br />CMTA Maitland Office <br />600 South Maitland Avenue Maitland, FL 1 32751 <br />MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning <br />
The URL can be used to link to this page
Your browser does not support the video tag.