My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-073
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 3:31:49 PM
Creation date
4/14/2025 3:03:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Developer's Agreement
Approved Date
03/25/2025
Control Number
2025-073
Agenda Item Number
11.a.1.
Entity Name
Meritage Homes of Florida, Inc.
Subject
Developer’s Agreement for Fair Share Roadway Improvement Contribution,
Right of Way Dedications and Associated Roadway and Drainage Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Incorporate into the land development permit design all required traffic and paving <br />improvements described in items # 10 and # 12 of this report, and the required acceptance of <br />stormwater run-off from adjacent public roads. <br />b. Obtain Planning staff approval of final landscape plans for all perimeter buffers and opaque <br />features, common areas, and the proposed lift station. <br />C. Obtain Environmental Planning staff approval of a tree relocation plan. <br />d. Enter into a developer's agreement with the County for a fair share contribution toward <br />funding the improvements to the 43rd Avenue / SR60 intersection. <br />e. Contribute $90,000.00 to the County for improvements to the SCI public park. <br />f. Complete all required ROW dedications for 431 Avenue SW, 211 Street SW, and 25`h <br />Street SW as described in this report. <br />g. Submit $25,000.00 to the County for the future signalization of the 43rd Avenue/21 St Street <br />SW intersection. <br />2. Prior to issuance of a certificate of completion for Phase 1, the applicant shall complete all required <br />off-site traffic improvements listed in items #10 and #12 of this report. <br />3. Prior to issuance of a certificate of completion for each respective phase, the applicant shall: <br />a. Install all required perimeter buffers and project landscape improvements. <br />b. Install all required project streetlighting. <br />C. Install all required external sidewalks. <br />4. Prior to or via the final plat, the developer shall dedicate rights to the County to discharge run-off <br />from 43rd Avenue SW, 21" Street SW, and 25th Street SW into the project's stormwater <br />management system. <br />5. Internal sidewalks shall be constructed along the frontage of common areas and individual lots in <br />accordance with Section 913.09(5)(b)2. of the County LDRs. <br />Attachments: <br />1. Location Map <br />2. Aerial <br />3. Preliminary PD Plan/Plat <br />4. Preliminary Landscape Plan <br />APPROVED AS TO FORM <br />ANVDKL.S7 7FIC' <br />eY <br />WILLIAM K. DEIIRAAL <br />DEPUTY COUNTY ATTORNEY <br />FACommunity Development\CurDev\P&Z\2022UAeside West Preliminary PD - PD -21-11-10 (90748).docx 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.