Laserfiche WebLink
EXHIBIT "E" <br />Development Permits Approved or Needed to Be <br />Approved for the Development <br />• IRC Preliminary Plat (approved and attached for reference) <br />• IRC Land Development Permit (approved but not yet released) <br />• IRC Land Clearing permit (gets released with LDP) <br />• IRC Tree Removal Permit (gets released with LDP after tree mitigation <br />fees have been paid) <br />• IRC Right of Way Permit (gets released with LDP) <br />• IRC Type B Stormwater Permit (gets released with LDP) <br />• Performance security for construction of offsite roadways is required prior <br />to release of Right of Way Permit and LDP. Developer may request to <br />follow the phasing designation of the Conditions of Approval <br />• IRC Utility Connection Permit (should be released soon) <br />• FDEP Domestic Water and Wastewater Connection Permits (approved <br />with UCP) <br />• IRC Concurrency Approval (approved) <br />• SJRWMD ERP (Approved) <br />• IRFWCD Connection Permit (in process) <br />• FDEP NOI (by contractor) <br />12 <br />4856-8263-0075, v. 6 <br />