8. Prior to issuance of a certificate of completion for each respective phase, the Developer <br />shall: <br />A. Install all required perimeter buffers and project landscape improvements. <br />B. Install all required project streetlighting, have it inspected and accepted. <br />9. At the time of offsite improvements for the respective phase, Developer shall incorporate <br />sufficient stormwater capacity in the Project to provide stormwater drainage for that <br />portion of 43rd Avenue SW, 21' Street SW, and 25t' Street SW which is adjacent to the <br />Project and dedicate the right to discharge runoff from those streets to the County as a <br />Public Benefit prior to or via the final plat in accordance with the Preliminary PD <br />Plan/Plat. (see Exhibit "D"). <br />10. Prior to issuance of a Land Development Permit, Developer shall pay to the County <br />Developer's contribution in the amount of Twenty -Five Thousand and No/100 <br />($25,000.00) dollars toward future traffic signal improvements at the intersection of 21' <br />Street SW and 43rd Avenue SW. (see Exhibit "D".) <br />11. Prior to issuance of a Land Development Permit, Developer shall pay to the County the <br />Developer's contribution in the amount of Ninety Thousand and No/100 (90,000.00) <br />dollars towards improvements to the South County Initiative Public Park. (see Exhibit <br />"D"). <br />12. Prior to issuance of a Land Development Permit, Developer shall obtain Environmental <br />Planning staff approval for a tree relocation plan with relocation of the selected trees to <br />be finalized prior to the issuance of a certificate of completion for each respective project <br />phase. (see Exhibit "D") <br />13. Project streetlights are required and shall be maintained by the property owner's <br />association. They must be installed, inspected, and accepted prior to the issuance of a <br />Certificate of Completion for each respective project phase. (see Exhibit "D"). <br />14. Five -foot -wide internal sidewalks will be provided throughout the project on both sides <br />of all internal streets and will connect to the external sidewalks system along 25' Street <br />SW, 21St Street SW, and 43rde Avenue SW. All sidewalks will be included in the <br />project's Land Development Permit and will need to be constructed along the frontage <br />of common areas and individual lots in accordance with the requirements of Indian River <br />County Code Section 913.09(5)(b)2. (see Exhibit "D"). <br />15. Indian River County Water and Sanitary Sewer facilities will be extended to the site as <br />part of Phase 1 improvements, prior to obtaining a certificate of completion for Phase 1. <br />Indian River County Roadway/Drainage improvements will be completed prior to <br />obtaining a certificate of completion for phase 1. Additionally, FPL will serve the site <br />and power will be brought to the site in order to complete Phase 1 (schedule to be <br />determined by Meritage). <br />4 <br />4856-8263-0075, v. 6 <br />