My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-042
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 11:06:56 AM
Creation date
4/15/2025 11:05:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/11/2025
Control Number
2025-042
Agenda Item Number
9.Y.
Entity Name
Lawrence Lee Construction Services, Inc
Subject
. Agreement for West Regional Wastewater Treatment Facility Clarifiers No. 1 and 2 Improvements;
RFP 2025006
Area
8405 8th Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP 2025006 - West Regional WWTF Clarifiers 1 and 2 Cost Proposal Form - Addendum 1 <br />Lawrence Lee Construction Services, Inc. Contractor Name <br />Table A-1 will be completed with unit prices provided by the Manufacturer to Proposer, which are to be attached. <br />Table A-1: WPE Costs <br />ITEM <br />DESCRIPTION <br />UNIT <br />UNIT PRICE <br /># <br />TOTAL <br />A. Equipment <br />Supply <br />1 <br />Clarifier center mechanisms and all components including but not <br />limited to center assemblies, influent wells, drive cages, collector arms, <br />skimmer arms, squeegees, troughs, motors, gear reducing assemblies, <br />local control panel, GFCI outlet, and over -torque switch <br />LS <br />$533,400.00 <br />1 <br />$533,400.00 <br />2 <br />Peripheral equipment packages including v -notch weirs, weir cleaning <br />systems, and scum troughs <br />LS <br />$78,700.00 <br />1 <br />$78,700.00 <br />3 <br />Replacements of Existing Weir Cleaning Systems <br />LS <br />$20,000.00 <br />1 <br />$20,000.00 <br />4 <br />Accessory and/or integral components <br />LS <br />$1.00 <br />1 <br />$1.00 <br />5 <br />Shop pre -assembly, coatings, assembly, testing, packing <br />LS <br />$1.00 <br />1 <br />$1.00 <br />6 <br />Shipping, free -on -board to jobsite <br />LS <br />$52,900.00 <br />1 <br />$52,900.00 <br />7 <br />Miscellaneous equipment costs* <br />LS <br />$1.00 <br />1 <br />$1.00 <br />Subtotal A <br />$685,003.00 <br />B. Manufacturer Services (total all personnel) <br />1 <br />Round Trips, incl. Expenses <br />EA <br />$4,050.00 <br />4 <br />$16,200.00 <br />2 <br />Lodging Room Nights <br />EA <br />$1,593.75 <br />8 <br />$12,750.00 <br />3 <br />Field Services, person -hours <br />EA <br />$158.75 <br />64 <br />$10,160.00 <br />4 <br />Shop Drawings and O&M Manuals, including resubmittals <br />LS <br />$1.00 <br />1 <br />$1.00 <br />5 <br />lCertifiications* <br />I LS <br />1 $1.001 <br />1 <br />$1.00 <br />6 <br />Imiscellaneous Services costs* <br />I LS <br />1 $1.001 <br />1 <br />$1.00 <br />Subtotal B <br />$39,113.00 <br />TOTAL QUOTED TO PROPOSER <br />$724,116.00 <br />*These items should be detailed on the quote from Walker Process Equipment <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.