Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />20 December 2024 <br />Page 5 <br />during the long-term care period. The report shall summarize the water quality monitoring <br />results and water level measurements collected since the last Technical Report. The last <br />Technical Report for both facilities was submitted to FDEP on 31 July 2023 for the reporting <br />period January 2021 through June 2023. The next Technical Report for the reporting period July <br />2023 through December 2025 is due for submittal to FDEP by 31 January 2026 and is included <br />in this proposal. <br />Title V Air Operation Permit Compliance <br />The SWDD was issued a Title V Air Operation renewal permit (Permit No. 0610015 -008 -AV), <br />proposed on 7 December 2022. The permit requires that the SWDD prepare and submit to the <br />FDEP and the U.S. Environmental Protection Agency (USEPA), Region 4 the following: <br />• Annual statement of compliance (within 60 days after the end of the calendar year); <br />• Electronic Annual Operating Report (AOR) and Title V Emissions Fee (on or before <br />April 1 of each year, for the previous calendar year); <br />• Semi -Annual Monitoring Report (scheduled for March l and August 29); and <br />• Results of an annual landfill gas (LFG) sulfur content test (Annual Emissions Report for <br />Sulfur Dioxide letter report and included in the Electronic Annual Operating Report). <br />The annual emissions fee is automatically calculated based on emissions reported for marked <br />pollutants on the FDEP's electronic Annual Operating Report (EAOR). Upon submission of the <br />EAOR, the Annual Title V Emissions Fee invoice is generated, and this must be paid by April 1, <br />2025 for the 2024 reporting period. <br />Landfill Gas Migration Monitoring <br />The Class I Landfill solid waste permit also requires quarterly monitoring of LFG migration <br />around the perimeter of the site and within enclosed structures. <br />Multi Sector General Permit <br />The SWDD authorization to discharge the overflow of stormwater from the sedimentation pond <br />into the C-6 canal is governed by a five-year Multi Sector General Permit (MSGP) issued by the <br />FDEP. The permit requires that the outfall be sampled quarterly during the first and fourth year <br />of the permit for a list of parameters and the results reported to the FDEP by the first quarter of <br />the fifth year of the permit. <br />This proposal presents the scope of work and budget estimate for the: (i) semi-annual water - <br />quality compliance monitoring and reporting for the Class I landfill and C&D debris disposal <br />NCP2323549AL23073_2025 Compliance Monitoring Proposal <br />cn};ineers I �cieutias innovators <br />