My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/25/2025
CBCC
>
Meetings
>
2020's
>
2025
>
02/25/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2025 12:57:51 PM
Creation date
4/24/2025 12:13:29 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/25/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order #14 — Bowman Consulting Group <br />IRCDUS 24 -inch Forcemain Replacement <br />Task 4 — Force Main Replacement Design <br />Bowman will prepare engineering design plans for a replacement 24" forcemain from the west side of the Florida <br />East Coast (FEC) Railway, across the Redstick Golf Course, and into the Facility. It is understood that the <br />replacement main will be configured to connect to a future in-line lift station. Bowman shall work with Utilities <br />and/or their consultant to ensure a compatible design. The construction plans, including plan, profile, and <br />construction details, and opinion of probable construction cost (OPC) will be submitted for review at the 90% <br />level. The final construction plans and OPC will reflect staff comments. <br />Deliverables <br />Construction Plans, (90% and Final); and <br />Opinion of Probable Construction Cost (90% and Final). <br />Task 5 — Permitting <br />At the outset of the project, Bowman will contact the Florida Department of Environmental Protection (FDEP) for <br />a permit determination. If necessary, a wastewater general permit shall be prepared and submitted as part of <br />this task. <br />*Note: the professional fees for this task do not include the permit application fee. <br />Task 6 — Bid Documents and Bidding Assistance <br />Bowman shall prepare bid documents and specifications to support a public bid. This task shall include attendance <br />of the pre-bid and bid opening, assistance addressing requests for information (RFI's) during the bid process, and <br />a recommendation of bid award. <br />Task 7 — Construction Observation & Certification <br />Following the selection of a contractor and award of bid, Bowman shall provide construction observation and <br />certification services. This task shall include shop drawing review, response to contractor requests for clarification <br />(RFC's), periodic site visits, and attendance of formal inspection/testing events. Upon completion of construction <br />the project's conformance to contract documents shall be certified to jurisdictional agencies and to IRCDUS. <br />SERVICES AND/OR INFORMATION TO BE PROVIDED BY OTHERS <br />Client or others will provide the following services and/or information: <br />A. Client will make available GIS, as -built drawings, easements and other records, and field locate the <br />subject main. <br />Provide record -drawings and information of existing improvements and utility -owned facilities and <br />other substructures. <br />C. Coordinate access to Redstick Golf Course for survey, soil borings, and construction. <br />Page 3 of 5 <br />116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.