My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/25/2025
CBCC
>
Meetings
>
2020's
>
2025
>
02/25/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2025 12:57:51 PM
Creation date
4/24/2025 12:13:29 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/25/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order #14 — Bowman Consulting Group <br />IRCDUS 24 -inch Forcemain Replacement <br />EXHIBIT B — FEE SCHEDULE <br />Bowman will provide the services described above for the following lump sum fees: <br />Task 1— <br />Special Purpose Survey <br />$ 14,290.00 <br />Task 2 <br />— Listed Species Survey <br />$ 4,370.00 <br />Task 3 <br />— Subsurface Soils Exploration <br />$ 3,375.00 <br />Task 4 <br />— Engineering Design <br />$ 31,200.00 <br />Task 5 <br />— Permitting (FDEP) <br />$ 1,600.00 <br />Task 6 <br />— Bid Documents & Bid Assistance <br />$ 4,500.00 <br />Task 7 <br />— Construction Observation & Certification: <br />521.000.00 <br />Total: $ 80,335.00 <br />EXHIBIT C —TIME SCHEDULE <br />This Task Order shall commence upon Notice to Proceed (NTP) with the work to be completed as follows: <br />Task 1— <br />Special Purpose Survey <br />30 days <br />Task 2 <br />— Listed Species Survey <br />30 days <br />Task 3 <br />— Subsurface Soils Exploration <br />30 days <br />Task 4 <br />— Engineering Design <br />30 days following Tasks 1 -3 <br />Task 5 <br />— Permitting (FDEP) <br />30 days <br />Task 6 <br />— Bid Documents & Bid Assistance <br />30 days following Task 4 <br />Task 7 <br />— Construction Observation & Certification: <br />Estimated 90 days from Contractor's NTP <br />Total: <br />90 days plus Construction <br />Page 5 of 5 <br />118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.