My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-075
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2025 11:00:53 AM
Creation date
5/2/2025 10:59:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/08/2025
Control Number
2025-075
Agenda Item Number
9.F.
Entity Name
Proctor Constructions Company, LLC
Subject
Section 00520 Agreement for Hobart Park Baseball Field Improvements 5151 77th Street;
Bid Number
2025030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Success: <br />All values <br />provided <br />#1-24 <br />Fencing 6' Height w/ Cap <br />LF <br />1525 <br />$ 66.81 <br />$ 101,881.04 <br />Success: <br />All values <br />provided <br />#1-25 <br />Fencing (Single gate) <br />EA <br />8 <br />$ 1,158.35 <br />$ 9,266.81 <br />Success: <br />All values <br />provided <br />#1-26 <br />Fencing (Double Gate) <br />EA <br />4 <br />$ 2,672.29 <br />$ 10,689.16 <br />Success: <br />All values <br />provided <br />#1-27 <br />2" x 12" Wood Back Stop <br />LF <br />186 <br />$ 25.86 <br />$ 4,810.12 <br />Success: <br />All values <br />provided <br />#1-28 <br />Thermoplastic Parking Striping /Signs <br />LS <br />1 <br />$ 5,000.00 <br />$ 5,000.00 <br />Success: <br />All values <br />provided <br />#1-29 <br />Sewer Wet Tap w/ Valve (12" x 4") <br />LS <br />1 <br />$ 9,304.18 <br />$ 9,304.18 <br />Success: <br />All values <br />provided <br />#1-30 <br />Gate Valve (4") <br />EA <br />1 <br />$ 3,662.87 <br />$ 3,662.87 <br />Success: <br />All values <br />provided <br />#1-31 <br />Sewer Lateral (4" PVC w/cleanout) <br />LF <br />120 <br />$ 217.59 <br />$ 26,110.29 <br />Success: <br />All values <br />provided <br />41-32 <br />Sewer Lift Station <br />LS <br />1 <br />$ 85,570.63 <br />$ 85,570.63 <br />Success: <br />All values <br />provided <br />#1-33 <br />Sewer Force Main (2" PVC) <br />LF <br />140 <br />$ 19.11 <br />$ 2,674.71 <br />Success: <br />All values <br />provided <br />#1-34 <br />Sewer Force Main (4" PVC) <br />LF <br />50 <br />$ 38.21 <br />$ 1,910.51 <br />Success: <br />All values <br />provided <br />#1-35 <br />Potable Water Wet Tap Connection (24" x 6") <br />LS <br />1 <br />$ 8,381.83 <br />$ 8,381.83 <br />Success: <br />All values <br />provided <br />#1-36 <br />Potable Water Fire Hydrant Assembly w/ Valve <br />LS <br />1 <br />$ 9,910.23 <br />$ 9,910.23 <br />Success: <br />All values <br />provided <br />#1-37 <br />314" Potable Water Service w/ RPZ <br />LF <br />180 <br />$ 26.53 <br />$ 4,776.27 <br />Success: <br />All values <br />provided <br />#1-38 <br />4" x 16" Wet Tap w/2" Threaded Nipple <br />EA <br />1 <br />$ 10,896.27 <br />$ 10,896.27 <br />Success: <br />All values <br />provided <br />#1-39 <br />2" Potable Water w/ RPZ <br />LF <br />580 <br />$ 32.90 <br />$ 19,083.86 <br />Success: <br />All values <br />provided <br />#1-40 <br />Irrigation /Well Installation <br />LS <br />1 <br />$ 122,655.00 <br />$ 122,655.00 <br />Success: <br />All values <br />provided <br />#1-41 <br />College Field - Root Zone Soil Mix (In Place) <br />CY <br />1420 <br />$ 114.47 <br />$ 162,547.40 <br />Success: <br />All values <br />provided <br />#1-42 <br />College Field -Warning Track <br />C" <br />210 <br />$ 408.36 <br />$ 85,755.60 <br />Success: <br />All values <br />provided <br />41-43 <br />College Field - Infield Clay Mix <br />CY <br />140 <br />$ 342.00 <br />$ 47,880.00 <br />Success: <br />All values <br />provided <br />#1-44 <br />College Field - Bullpens - Clay Mix <br />SY <br />70 <br />$ 187.93 <br />$ 13,155.00 <br />Success: <br />All values <br />provided <br />#1-45 <br />College Field - Bullpens - Warning Track Material <br />SY <br />100 <br />$95.41 <br />$ 9,541.00 <br />Success: <br />All values <br />provided <br />#1-4e <br />College Field - Field Grading (Root Zone Mix / <br />SY <br />13000 <br />$ 2.09 <br />$ 27,170.00 <br />Success: <br />All values <br />provided <br />#1-47 <br />College Field - Grassing - Performance Turf <br />SY <br />12900 <br />$ 7.99 <br />$ 103,071.00 <br />(Sprigged) <br />Success: <br />All values provided <br />#1-48 <br />Hybrid Field - Root Zone Soil Mix (In Place) <br />CY <br />815 <br />$ 122.03 <br />$ 99,454.45 <br />Success: <br />All values provided <br />#1-49 <br />Hybrid Field -Warning Track <br />CY <br />110 <br />$ 498.57 <br />$ 54,842.70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.