My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-075
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2025 11:00:53 AM
Creation date
5/2/2025 10:59:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/08/2025
Control Number
2025-075
Agenda Item Number
9.F.
Entity Name
Proctor Constructions Company, LLC
Subject
Section 00520 Agreement for Hobart Park Baseball Field Improvements 5151 77th Street;
Bid Number
2025030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br />written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for performance and furnishing of the Work. <br />K. CONTRACTOR is registered with and will use the Department of un Security's E -Verify <br />system (www.e-verify.gov) to confirm the employment eligibility of all newly hired employees <br />for the duration of this agreement, as required by Section 448.095, F.S. CONTRACTOR is <br />also responsible for obtaining an affidavit from all subcontractors, as required in Section <br />448.095(5)(b), F.S., stating the subcontractor does not employ, contract with, or subcontract <br />with an unauthorized alien. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520-1 to 00520-8, inclusive); <br />2. Notice to Proceed (page 00550-1); <br />3. Public Construction Bond (pages 00610-1 to 00610-3, inclusive); <br />4. Sample Certificate of Liability Insurance (page 00620-1); <br />5. Contractor's Application for Payment (pages 00622-1 to 00622-6 inclusive); <br />6. Certificate of Substantial Completion (pages 00630-1 to 00630-2, inclusive); <br />7. Contractor's Final Certification of the Work (pages 00632-1 to 00632-2, inclusive); <br />8. Professional Surveyor & Mapper's Certification as to Elevations and Locations of the <br />Work (page 00634-1 <br />9. General Conditions (pages 00700-1 to 00700-38, inclusive); <br />10. Supplementary Conditions (pages 00800-1 to 00800-13, inclusive); <br />11. Specifications as listed in Division 1 (General Requirements) and the incorporated <br />Concession Building Project Manual Bid Set prepared by Donadio & Associates, <br />Architects; <br />12. Drawings consisting of a cover sheet, Civil Engineering Plans numbered 1 through 15, <br />inclusive, landscape plans numbered LC -1 through LC -3, inclusive, irrigation plans <br />numbered 1 through 10, inclusive, with each sheet bearing the general title,: Hobart Park <br />Baseball Field Improvements; Site Electrical Plans numbered E0.1 and E0.2, and <br />architectural plans including title sheet, and sheets A1.10, A2.10, A2.20, A2.30, A3.10, <br />A4.10, A6.10, S -1,S-2, M1.1, E1.1, E1.2, E1.3 and P1.1, with each sheet bearing the <br />Agreement - 00520 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.