My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-083
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2025 12:09:03 PM
Creation date
5/2/2025 12:08:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/08/2025
Control Number
2025-083
Agenda Item Number
13.K.1.
Entity Name
Quest Contracting, LLC
Subject
Section 00520 Agreement for Sandridge Golf Club New Clubhouse
Area
5300 73rd Street
Bid Number
2025026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 Sample Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and Quest Contracting, LLC (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />Construction of a new two-story clubhouse building, parking area, separate turn building, and the <br />demolition of the existing clubhouse. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: Sandridge Golf Club New Clubhouse / <br />Bid Number: 2025026 <br />Project Address: 5300 731d Street, Vero Beach, FL 32967 <br />ARTICLE 3 - ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contractor's Schedule submitted with its bid, and in the <br />Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work for Phase 1 and Phase 2 of the project will be substantially completed on or before <br />the 462nd calendar day after the date when the Contract Times commence to run as <br />provided in paragraph 2.03 of the General Conditions, and completed and ready for final <br />payment in accordance with paragraph 14.07 of the General Conditions on or before the <br />492nd calendar day after the date when the Contract Times commence to run. Sandridge <br />Golf Operations to move into new clubhouse within 2 days of obtaining a temporary <br />certificate of occupancy. <br />Agreement - 00520 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.