Laserfiche WebLink
SECTION 00520 Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and Lawrence Lee Construction Services, Inc. (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />Furnish all labor, equipment and materials necessary to construct one (1) Floridan Aquifer <br />production well S-1 R for Indian River County Department of Utility Services (I RCDUS), South Water <br />Treatment Plant (WTP), located in Indian River County, Florida. Scope of work includes wellhead <br />assembly, well facility disinfection and restoration of well site, raw water main, electrical system, <br />instrumentation and controls and all other support systems as described herein and as shown on <br />the drawings. The Well drilling will be completed by others and is not included under this scope of <br />work. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: Upper Floridan Aquifer S1 R Well head & Raw Water Main <br />County Project Number: IRC -11.22.503B <br />Bid Number: 2025018 <br />Project Address: 1550 9th St SW, Vero Beach, FL 32962 <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 330th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph 14.07 <br />of the General Conditions on or before the 365th calendar day after the date when the <br />Contract Times commence to run. <br />3.03 Liquidated Damages <br />Agreement - 00520 -1 <br />