My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-095
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 11:55:15 AM
Creation date
5/12/2025 11:53:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/22/2025
Control Number
2025-095
Agenda Item Number
9.R.
Entity Name
Lawrence Lee Construction Services, Inc.
Subject
Section 00520 Agreement for Phase 2 of Upper Floridian Aquifer S1R Well Head & Raw Water
Main 1550 9th St. SW
Project Number
IRC-11.22.503B
Bid Number
2025018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and Lawrence Lee Construction Services, Inc. (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />Furnish all labor, equipment and materials necessary to construct one (1) Floridan Aquifer <br />production well S-1 R for Indian River County Department of Utility Services (I RCDUS), South Water <br />Treatment Plant (WTP), located in Indian River County, Florida. Scope of work includes wellhead <br />assembly, well facility disinfection and restoration of well site, raw water main, electrical system, <br />instrumentation and controls and all other support systems as described herein and as shown on <br />the drawings. The Well drilling will be completed by others and is not included under this scope of <br />work. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: Upper Floridan Aquifer S1 R Well head & Raw Water Main <br />County Project Number: IRC -11.22.503B <br />Bid Number: 2025018 <br />Project Address: 1550 9th St SW, Vero Beach, FL 32962 <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 330th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph 14.07 <br />of the General Conditions on or before the 365th calendar day after the date when the <br />Contract Times commence to run. <br />3.03 Liquidated Damages <br />Agreement - 00520 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.