My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/08/2025
CBCC
>
Meetings
>
2020's
>
2025
>
04/08/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 1:48:05 PM
Creation date
5/22/2025 12:37:03 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/08/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
633
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRIORITY 3: Implement and maintain next generation 911 services and <br />equipment. <br />PRIORITY 4: Mapping system and services necessary for provisioning <br />Geographic Information Systems (GIS). This includes the following, listed in <br />order of funding priority: <br />A) Map System Equipment - map generation hardware and software <br />licensing are limited to components for two stations. <br />B) GIS Centerline point generation and map accuracy systems <br />C) Synchronization of GIS data and databases that support location <br />repositories to meet a minimum 98% data accuracy for Geospatial call routing. <br />D) Map display and services <br />PRIORITY 5: Develop and maintain Next Generation 911 services and equipment. <br />A) Next Generation 911 Equipment and Emergency Services IP based <br />network <br />B) Next Generation Core Services <br />PRIORITY 6: Systems that require new or replacement of critical or necessary <br />hardware or software. This includes the following back-up PSAP's system <br />equipment, listed in order of funding priority A -H: <br />A) Hardware and software for communications or terminal equipment <br />located at a PSAP for 911 call processing, ANI and ALI display, and call <br />answering. <br />B) Map Display Equipment <br />C) Logging Equipment <br />D) Lightning Protection Equipment <br />E) Uninterruptible Power Supply system and or Generator Equipment <br />F) County, group of counties or region Standalone ALI Database Equipment <br />G) 911 Call Taker Position Equipment <br />H) Net clock <br />PRIORITY 7: GIS sub -addressing projects <br />PRIORITY 8: Aerial Photography, Overhead (Nadir) / Imaging <br />PRIORITY 9: Infrastructure cabling and building entrance buildout cost. <br />PRIORITY 10: 911 Call taker workstation console/furniture (the portion related to <br />911 operation) <br />Application and instructions for 911 Grant Programs, revised May 2023 <br />W Form 3A, incorporated by reference in Fla. Admin. Code R. 60FF1-5.003 911 Grant Programs <br />24 <br />172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.