My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/08/2025
CBCC
>
Meetings
>
2020's
>
2025
>
04/08/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 1:48:05 PM
Creation date
5/22/2025 12:37:03 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/08/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
633
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment — BCC 25-0442 <br />Award of Bid 2025030 for Hobart Park Baseball Field Improvements <br />186 <br />Agenda <br />Date <br />Action <br />Cost <br />Notes <br />Item <br />Work Order #5 <br />for Masteller & <br />For design, permitting <br />January 9, 2018 <br />Moler Issued <br />$66,025.00 <br />and construction plans <br />17-1315 <br />For Architectural <br />Modifications, <br />Work Order #5 <br />Mechanical and <br />Amendment #1 <br />Electrical Engineering, <br />July 17, 2018 <br />issued <br />$13,165.00 <br />and Irrigation Desi <br />18-2049 <br />For Bidding Assistance, <br />Work Order #1 <br />Construction <br />for Masteller & <br />Observation and Punch <br />July 2, 2019 <br />Moler Issued <br />$73,145.00 <br />List Observation <br />19-0581 <br />Bids Rejected <br />due to cost over <br />Bid 2020005 <br />engineer's <br />Bid Range: <br />November 19, <br />estimate of <br />$3,226,631.17- <br />2019 <br />$2.4M <br />$4,584,884.00 <br />19-1038 <br />Work Order #1 <br />Amendment #1 <br />issued to <br />Issued to include a plan <br />Masteller & <br />for possible phasing of <br />May 19, 2020 <br />Moler <br />$13,615.00 <br />the project <br />20-1558 <br />Add Architectural <br />Review, Structural <br />Engineering Review <br />and Electrical & <br />Mechanical Review to <br />Work Order #1 <br />bring plans up to new <br />Amendment #2 <br />building code issued in <br />March 2, 2021 <br />issued <br />$12,219.00 <br />Dec 2020 <br />21-0264 <br />Relayed that it was not <br />in our best interest <br />phase the project <br />because savings would <br />not be realized. <br />Recommendation to <br />move forward with the <br />project as originally <br />Plans sent to <br />designed with <br />Public Works <br />modifications made to <br />Director, Rich <br />incorporate new <br />Szpyrka for <br />building code, update <br />March 3, 2023 <br />review <br />permits, etc. <br />186 <br />
The URL can be used to link to this page
Your browser does not support the video tag.