My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/25/2025
CBCC
>
Meetings
>
2020's
>
2025
>
03/25/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2025 10:04:05 AM
Creation date
5/23/2025 8:54:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/25/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Work Order Number 2018007-5 <br />Sector 7 Beach and Dune Restoration Project Exhibit 1 - Scope of Work <br />Exhibit 1 - Scope of Work <br />Sector 7 Alternatives Assessment <br />Introduction: The County's Sector 7 Beach Restoration Project was initially constructed in 2007. The <br />initial Project included placement of about 360,000 cubic yards of sand from the County's offshore <br />borrow area to partially restore over about 2.2 miles of beach. The initial Project area: <br />• was authorized by permits issued by the Florida Department of Environmental Protection <br />(FDEP) and the U. S. Army Corps of Engineers (USACE), and <br />• extended from FDEP reference monuments R-97 to R-108. <br />Since the initial 2007 construction, Sector 7 beaches have eroded and been damaged by numerous <br />hurricanes and storms. Re -nourishment of Sector 7 beaches from R-97 to R-108: <br />• was authorized by the COUNTY for design, monitoring, permitting, and solicitation of bids; <br />• however, bids were rejected by the County due to the refusal of multiple property owners — <br />mostly in the northern "feeder beach" portion of the Project Area (North of R-99) and the <br />southern portion of the Project from R-106.5 to R-108 - to provide construction easements <br />required for construction. <br />This Scope of Work is to empirically evaluate the expected performance of alternative fill areas — <br />particularly associated with modification of the northern Project boundary from R-97 to R-99, and <br />the southern Project boundary from R-106.5 to R-108. The following describes the work under this <br />Work Order: <br />Task 1 — Alternative Assessment: The Consultant will: <br />• update the Construction Drawings previously prepared for the Sector 7 Beach restoration <br />Project with updated survey data provided by the County; <br />• prepare Construction Drawings for an alternate Project which will remove the parcels where <br />construction easements have not been signed as identified by the County; <br />• identify the volume of sand required to construct the previously approved construction <br />template and alternate construction template; <br />• review monitoring surveys and reports surrounding and subsequent to the 2007 initial <br />construction to identifythe performance of the 2007 beach fill; <br />• review the latest edition of the County's Beach Preservation Plan Update to be provided by <br />the County; <br />• perform volume change calculations within the Project limits based upon 2019 and 2024 <br />survey data provided by the County; <br />• based upon the post -construction monitoring data, beach preservation plan, and volume <br />change calculations, characterize performance of two alternative potential future beach fill <br />including: <br />o as previously designed and permitted, and <br />o as previously designed - excluding beach nourishment between R-97 to R-99, and R- <br />106.5 to R-108. <br />• using empirical methods, quantify expected Project performance for years after <br />construction as: <br />o percent of beach fill remaining; <br />o shore -normal width of beach berm from the Mean -High -Water -Line (MHWL) to the <br />seaward toe of the dune or upland structure; and <br />• summarize results of the above in a Technical Memo to the COUNTY; <br />Page 1 of 2 <br />January 28, 2025 <br />218 <br />
The URL can be used to link to this page
Your browser does not support the video tag.