Laserfiche WebLink
A TRUE COPY <br />'.'ER T IFICATION ON LAST PAGE <br />HN L. BUTLER, CLERK <br />V. 40 C.F.R. Part 7, (implementing Title VI of the Civil Rights Act of 1964, Section 13 of the 1972 <br />Amendments to the Federal Water Pollution Control Act, and Section 504 of the Rehabilitation Act of <br />1973); <br />vi. United States Executive Order (EO) 13166 (federal agencies required to ensure that recipients of federal <br />financial assistance take reasonable steps to provide meaningful access to their programs and activities <br />by Limited English Proficiency (LEP) persons). <br />vii. Florida Civil Rights Act of 1992 (Title XLIV Chapter 760, Sections 760.01, 760.11 and 509.092, F.S.), <br />including Part I, chapter 760, F.S. (prohibiting discrimination on the basis of race, color, religion, sex, <br />pregnancy, national origin, age, handicap, or marital status). <br />c. This Agreement shall be governed by and construed in accordance with the laws of the State of Florida. <br />d. Any dispute concerning performance of the Agreement shall be processed as described herein. Jurisdiction for <br />any damages arising under the terms of the Agreement will be in the courts of the State, and venue will be in the <br />Second Judicial Circuit, in and for Leon County. Except as otherwise provided by law, the parties agree to be <br />responsible for their own attorney fees incurred in connection with disputes arising under the terms of this <br />Agreement. <br />24. Build America, Buy America Act (BABA) - Infrastructure Projects with Federal Funding. <br />This provision does not apply to Agreements that are wholly funded by Coronavirus State and Local <br />Fiscal Recovery Funds under the American Rescue Plan Act. Also, this provision does not apply where <br />there is a valid waiver in place. However, the provision may apply to funds expended before the waiver <br />or after expiration of the waiver. <br />If applicable, Recipients or Subrecipients of an award of Federal financial assistance from a program for <br />infrastructure are required to comply with the Build America, Buy America Act (BABA), including the <br />following provisions: <br />a. All iron and steel used in the project are produced in the United States --this means all manufacturing processes, <br />from the initial melting stage through the application of coatings, occurred in the United States; <br />b. All manufactured products used in the project are produced in the United States -this means the manufactured <br />product was manufactured in the United States; and the cost of the components of the manufactured product <br />that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all <br />components of the manufactured product, unless another standard for determining the minimum amount of <br />domestic content of the manufactured product has been established under applicable law or regulation; and <br />c. All construction materials are manufactured in the United States -this means that all manufacturing processes for <br />the construction material occurred in the United States. <br />The Buy America preference only applies to articles, materials, and supplies that are consumed in, incorporated <br />into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as <br />temporary scaffolding, brought to the construction site and removed at or before the completion of the <br />infrastructure project. Nor does a Buy America preference apply to equipment and furnishings, such as movable <br />chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but <br />are not an integral part of the structure or permanently affixed to the infrastructure project. <br />25. Investing in America <br />Grantees of an award for construction projects in whole or in part by the Bipartisan Infrastructure Law or the <br />Inflation Reduction Act, including the following provision: <br />a. Signage Requirements <br />a. Investing in America Emblem: The recipient will ensure that a sign is placed at construction <br />sites supported in whole or in part by this award displaying the official Investing in America <br />emblem and must identify the project as a "project funded by President Biden's Bipartisan <br />Infrastructure Law" or "project funded by President Biden's Inflation Reduction Act" as <br />applicable. The sign must be placed at construction sites in an easily visible location that can be <br />directly linked to the work taking place and must be maintained in good condition throughout the <br />construction period. <br />The recipient will ensure compliance with the guidelines and design specifications provided by <br />EPA for using the official Investing in America emblem available at: <br />h!Ms://www.0a.gov/invest/investing-america-signage. <br />b. Procuring Signs: Consistent with section 6002 of RCRA, 42 U.S.C. 6962, and 2 CFR 200.323, <br />recipients are encouraged to use recycled or recovered materials when procuring signs. Signage <br />Attachment 1-C <br />10 of 14 <br />Rev. 3/21/2025 <br />