Laserfiche WebLink
SECTION 00520 Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and Florida Design Drilling, LLC (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />Furnish all labor and materials necessary to construct the proposed effluent reject <br />piping improvements, rib influent piping improvements, along with fittings, valves, <br />appurtenances, electrical work and any other items as depicted in these documents <br />to provide a complete and functional system at the West Regional Wastewater <br />Treatment Facility. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: West Regional Wastewater Treatment Facility (WWTF) Effluent <br />Reject <br />Bid Number: 2025024 <br />Project Address: 8405 8th St, Vero Beach, FL 32968 <br />ARTICLE 3 - ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 240th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph 14.07 <br />Public Construction Bond - 00610 - 2 <br />F:\Purchasing\Bids\2024-2025 FV (2025000)\2025024 Automatic Effluent Reject System West WWTF\Bid Docs\Sample agreement.doa <br />