Laserfiche WebLink
Exhibit A <br />Work Order 9 <br />SCHEDULE <br />0"AtkinsRealis <br />Task Weeks From Kick -Off <br />Draft Risk Register & Asset List <br />12 <br />Updated Construction Documents <br />12 <br />Review Workshop <br />14 <br />Final Bid Documents <br />18 <br />FDEP Permit <br />18 <br />Bid Phase <br />20 <br />Contractor NTP <br />TBD <br />Construction Completion <br />NTP + 52 weeks <br />Record Drawings <br />NTP + 12 weeks <br />QUALITY CONTROL <br />AtkinsRealis will be responsible for the professional quality of all deliverables. This shall include <br />an internal Quality Assurance Plan that, as a minimum, provides review of all deliverables and <br />significant calculations by another qualified professional that was not responsible for project <br />execution. <br />ASSUMPTIONS <br />The following assumptions have been made in the development of this scope of work, schedule, <br />and fee: <br />1. DEP Minor Modification Permitting fees will be provided by Indian River County. <br />2. Survey, subsurface utility engineering or geotechnical services are not required. <br />3. Neighborhood/community meetings are not needed. <br />4. Review Workshop will be focused on updated documents only. <br />5. Project will comply with all federal, state, and local codes in effect when NTP is given. <br />6. Contractor is responsible for all materials testing for compliance with the specifications. <br />7. County Purchasing will provide contract terms, general and supplemental conditions to <br />be updated by AtkinsRealis and IRCDUS. <br />8. Management of bid phase services will be completed by IRCDUS's Purchasing <br />Department including advertising, contract preparation and review, bidder coordination, <br />and facilitation of the pre-bid meeting and site visit. <br />9. Full-time on-site construction services are not required for this project and are not <br />included in the scope and fee. <br />Page 7 of 8 <br />