My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-114
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2025 11:49:02 AM
Creation date
6/2/2025 11:48:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/20/2025
Control Number
2025-114
Agenda Item Number
9.M.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Engineering Services Work Order 20 for 1st Street SW & 27th Avenue Intersection;
Project Number
IRC-1231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1st Street SW & 27th Avenue <br />Intersection Improvements <br />D. Signing and Pavement Marking Plans: <br />Signing and Pavement Marking plans shall include: Preparation of the plan layout, quantities (including <br />signing and pavement marking quantity) and tabulation of quantities. All plans are to be prepared in <br />accordance with the latest design standards and practices (MUTCD), FDOT Standard Specifications, <br />Indexes, and shall be accurate, legible, complete in design and drawn at the same scale as the Roadway <br />Plans, furnished in reproducible form. Plans will be included with the roadway plans and submitted as <br />indicated above. <br />E. Utility Coordination: <br />The CONSULTANT will coordinate with franchise utility operators in the vicinity of the project such that <br />the proposed construction activities can be developed to minimize impacts to existing utilities located <br />within the project limits. Any utility permitting and relocation design required to accommodate the <br />proposed improvements will be addressed as an additional service relative to this scope of work. <br />F. Signalization Plans: <br />Mast -arm traffic signal configurations at the Vt Street SW and 27th Avenue intersection will be designed <br />to meet current County and FDOT standards. Luminaires will be provided on each mast arm pole. The <br />pole analysis and design of the signal systems will be completed and submitted to County for review. <br />Signalization plans will be included with the roadway plans and submitted as indicated above. <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />
The URL can be used to link to this page
Your browser does not support the video tag.