Laserfiche WebLink
Indian River County, Florida <br />MEMORANDUM <br />File ID: 25-0466 Type: Consent Staff Report <br />TO: Board of County Commissioners <br />THROUGH: John A. Titkanich, Jr., County Administrator <br />FROM: Patrick J. Murphy, Chief of Long Range Planning <br />DATE: April 8, 2025 <br />In <br />Indian River County <br />Administration Complex <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />indianriver.gov <br />Meeting Date: 4/22/2025 <br />SUBJECT: Pulte Home Company, LLC's Request for Final Plat Approval for <br />Harbor Isle Phase 2 [SD -20-11-04 / 99070005-96349] <br />BACKGROUND <br />Masteller, Moler & Taylor, Inc., on behalf of Pulte Home Company, LLC, is requesting final plat approval for <br />the second/final phase of a residential development project to be known as Harbor Isle. The project site is <br />located south of SR 510 and east of U.S. Highway 1 (see attachment 1). The subject site is zoned RM -6, <br />Residential Multiple -Family (up to 6 units per acre) and OCR, Office, Commercial, Residential District (up to 6 <br />units per acre). The property has M-1, Medium -Density Residential -1 (up to 8 units per acre); C/I, <br />Commercial/Industrial; and C-2, Conservation -2 (up to 1 unit per 40 acres) future land use designations, <br />respectively. The density for Phase 2 of Harbor Isle is 4.88 units per acre (180 single-family lots on 36.88 <br />acres). <br />Harbor Isle, overall, is a 270 -unit "plat -over" site plan project consisting of detached single-family units, <br />whereby an individual lot will be established over each residential unit. Thus, each unit will be conveyed to a <br />future owner on a fee -simple lot. On October 28, 2021, the Planning & Zoning Commission (PZC) granted <br />major site plan and preliminary plat approval for Harbor Isle to develop upon 101.26 acres, at an overall density <br />of 2.67 units per acre. Phase I of this project consists of 90 detached single-family units and was granted final <br />plat approval by the BCC on January 9, 2024. <br />The remaining 180 single-family lots are shown on the attached final plat layout. As of this time, the developer <br />has constructed almost all the required project improvements, including all life -safety items, and a temporary <br />suspension of compliance for certificate of completion was issued by the County Administrator on March 31, <br />2025. The conditions of the temporary certificate of completion are as follows: <br />1. Install SR 510 final lift of asphalt pavement, permanent striping (Thermoplastic), and signage for the <br />turn lanes into the project from SR 510; <br />2. Post the final lift, striping, and signage bond covering a minimum of 125% of the costs of the on-site <br />roadway improvements; and <br />Indian River County, Florida Page 1 of 2 Printed on 4/16/2025 <br />powered by Legistar11 119 <br />