Consent Item <br />2023, to provide additional services and additional time to assist with project delivery caused by a time <br />extension to the contractor (see below), which increased WO 6 by $263,133.00. <br />On June 15, 2021, the BCC awarded Bid #2021026 to TLC Diversified, Inc. (TLC) for the construction of the <br />Oslo WTP Improvements project for the amount of $10,665,515.65. The Notice to Proceed (NTP) was issued <br />on August 4, 2021, setting the initial completion date to November 2, 2023. Subsequent to the award, <br />approved Work Change Directive (WCD) 1, Change Order 1 (CO 1), CO 2, and CO 3 were issued to TLC that <br />cumulatively added work items, and increased the contract value by $1,020,621.72. <br />Due to delays in lead times for materials as well as an increase in scope through change orders, TLC was not <br />forecasted to meet the November 2, 2023, final completion date. As such, IRCDUS approved WCD 2 to TLC <br />on August 9, 2023, authorizing a time extension which extends the substantial completion date to March 15, <br />2024, and final completion date to May 17, 2024. <br />Analysis: <br />Based on the progress of construction post August 9, 2023, when the time extension was approved via <br />WCD 2, it became evident that TLC was not going to meet the March 15, 2024 substantial completion nor <br />the May 17, 2024 final completion dates. This was confirmed by TLC in a bi-weekly meeting on February <br />21, 2024. In said meeting, IRCDUS requested that TLC submit a formal request for a time extension. On <br />March 1, 2024, IRCDUS issued the attached Notice of Intent (NOI) to Assess Liquidated Damages to TLC. <br />TLC responded to IRCDUS's NOI on March 6, 2024 (see attached letter). The TLC response laid out the <br />circumstances surrounding delays they encountered and provided a draft finishing schedule with key <br />milestone dates to complete construction. <br />IRCDUS staff, KHA, and TLC held meetings to review the draft finishing schedule and develop agreed upon <br />options to minimize the additional time beyond the May 17, 2024 final completion date. The discussions <br />include potential additional costs to IRCDUS for the time extension to which the TLC project manager <br />proposed a deduction from the contract value to offset any cost increase to IRCDUS. As a result, TLC has <br />submitted CO 4 (see attached) that includes 1) a second time extension of 77 days to yield a new final <br />completion date of August 2, 2024 (1,094 days from NTP), and 2) a Change in Contract Price for line item 345 <br />of the schedule of values, which totals $54,928.65 reduction. <br />As noted above, granting TLC the second time extension request will result in additional costs to IRCDUS to <br />retain KHA for continuation of construction phase services. Upon request by IRCDUS, KHA provided <br />Amendment 2 to WO 6 for additional construction phase services through August 2, 2024, for the amount of <br />$51,359.00. Amendment 2 to WO 6 includes coordination and progress meeting attendance, preparation of <br />meeting minutes, construction observations, and inspector and engineer observations. <br />The effect of deducting $54,928.65 from the TLC contract value and incurring the additional cost for KHA <br />services, will result in a net savings of $3,569.65 in the overall cost of the Oslo Water Treatment Plant <br />Improvements project. <br />Funding: I <br />A net reduction of expenses in the amount of $3,569.65 ($54,928.65 for the reduction in TLC contract value <br />i <br />!i <br />I <br />1�5 <br />j, <br />