My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/22/2025
CBCC
>
Meetings
>
2020's
>
2025
>
04/22/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 10:25:59 AM
Creation date
6/10/2025 9:06:39 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/22/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Florida <br />K <br />*�A * MEMORANDUM <br />File ID: 25-0452 Type: Consent Staff Report <br />TO: Board of County Commissioners <br />�r_ <br />Indian River County <br />Administration Complex <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />indianriver.gov <br />Meeting Date: 4/22/2025 <br />THROUGH: John A. Titkanich, Jr., County Administrator <br />Kylie Yanchula, Natural Resources Director <br />FROM: Eric Charest, Assistant Director, Natural Resources Department <br />DATE: March 25, 2025 <br />SUBJECT: Work Order No. 2018006-20 - APTIM, Sector 3 Hurricanes Ian and Nicole Dune <br />Renourishment <br />Year 1 Physical Monitoring Report <br />BACKGROUND <br />On January 9, 2018, the Board of County Commissioners (BCC) approved a contract with Aptim <br />Environmental & Infrastructure, Inc. (APTIM) for professional coastal engineering and biological support <br />services related to the management and nourishment of Sector 3 (Wabasso Beach). The Sector 3 project area is <br />a critically eroded 6.6 -mile section of engineered shoreline that extends from the Seaview Subdivision south <br />past the Turtle Trail beach park. The Sector 3 coastline suffered significant storm related losses to the beach and <br />dune system from the impacts of Hurricanes Ian (2022) and Nicole (2022) creating the need for repair. <br />On November 7, 2023, the BCC awarded Bid No. 2024004 to Dickerson Infrastructure, Inc. dba Dickerson <br />Florida, Inc. for the Sector 3 Hurricanes Ian and Nicole Dune Renourishment Project. Construction commenced <br />on December 1, 2023 and completed on April 13, 2024. The project consisted of a dune restoration project that <br />placed approximately 223,040 cubic yards of beach compatible sand fill and installing approximately 728,633 <br />native dune plants along the shoreline in Indian River County from FDEP range monuments R20 to R55. <br />Regulatory permits issued for the beach restoration activities identify post -construction related monitoring to be <br />performed on a set schedule for several years following completion of construction. These monitoring <br />activities are evaluated to demonstrate compliance with permit conditions. APTIM will develop an engineering <br />monitoring report that discusses the physical performance of the beach fill project in order to meet Florida <br />Department of Environmental Protection (FDEP) permit requirements. <br />The proposed Work Order No. 2018006-20, in the amount of $28,218.00 provides professional services for <br />assessing the project performance in the form of a Year 1 Physical Monitoring Report related to the Sector 3 <br />Hurricanes Ian and Nicole Dune Renourishment Project. <br />Task 1: 2025 Year 1 Post -Construction Physical Monitoring Report ($28,218.00) <br />Indian River County, Florida Page 1 of 2 Printed on 4/16/2025 <br />powered by LegistarTu 82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.