Laserfiche WebLink
J. The COUNTY shall obtain the As -Built drawings from the General Contractor awarded the <br />project. The project contract documents will be prepared to specify this requirement. <br />SCOPE OF SERVICES <br />The CONSULTANT agrees to perform professional services in connection with the project as <br />required and as set forth in the following: <br />A. GENERAL <br />1. The CONSULTANT will provide professional engineering and architectural Consultant <br />services for the preparation of site and building construction plans, including surveying, <br />civil engineering, architectural design, structural engineering, geotechnical engineering, <br />mechanical and electrical engineering, preparation of working drawings, an opinion of <br />probable cost, field inspections and reports, and related construction administration <br />services, for the construction of site and building improvements necessary for the <br />development of the new Service Building. <br />2. The CONSULTANT shall prepare all building architectural and building engineering system <br />designs, including structural, mechanical, and electrical systems, except the structural <br />engineering and design normally provided by the steel manufacturer for pre-engineered <br />steel structures. <br />3. The CONSULTANT shall prepare all site structure designs, including but not limited to, <br />flag pole foundation, dumpster enclosure, grade level walkways, curbing, wheel stops, <br />bollards, culverts, transformer pad, headwalls, and signage. All site structures shall <br />comply with the wind pressure requirements in 2020 Florida Building Code for high <br />velocity wind zones. <br />4. The CONSULTANT will provide a site plan conforming to 2020 Florida Building Code <br />accessibility requirements including building location, and accessible route to other <br />buildings on site and required entries and exits, sidewalks, accessible route to public <br />R.O.W., parking, vehicular use areas, curb cuts, driveways, circulation, site lighting, light <br />pole locations, selected fixture manufacturer's photometric site overlay, utility and <br />drainage facilities, site data and site calculations. The format for this documentation will <br />be AUTO CAD (latest version), and shall clearly show the area for placement of the <br />buildings/improvements required in the program data. <br />5. The CONSULTANT'S preliminary planning and programming efforts for the Service <br />Building should take into account the following: <br />A. The service building should be a pre -fabricated steel structure (to match the <br />existing service building), approximately 51' x 61', providing 2 service bays, parts and <br />equipment storage, optimal equipment location utilized to service transit vehicles. <br />4 <br />